Laserfiche WebLink
EXTENT OF FORMER EXCAVATIO GP-6 GP-2 GP-3 GP-4 CPT-1 MW-1 <br /> \ \ \ SP CROSS-SECTION B-B' <br /> VIEW KING WEST <br /> 5 GL \ GL 5 LEGEND <br /> 10 _ SP = SAND a <br /> SP Jy fr <br /> 15 ML ML Q Z <br /> CL 15 SM = SILTY SAND <br /> CL mVIUQ <br /> 29 CL -. 18.43: - tvAl_ ,,.. ML z0 I JWZ <br /> 721 /, SC = CLAYEY SAND z O �O <br /> <0.12 CL z US <br /> 25 ML SM. 1 ML F � CDQ <br /> 25 SC/SM = CLAYEY SAND/ U Z m U <br /> ��IM <br /> CL SILTY SAND 7 Z <br /> (A F- <br /> 30 103. 298 <0.020 30 ML= SILT N Q ( Y <br /> 988 3,030 a.0 <br /> 141+ 1.13 <0.50 <0.005 o l Q UP <br /> U F. <br /> 35 - - -- - - - - - - -- - - - - - - - U ¢ t to <br /> 1 421.3 x.022 C - - - 35 ML/CL = CLAYEY SILT Z J <br /> CL CL 3.540 <1.0 SP 5 <br /> <1.25 <0.005 0 <br /> 40 <0.020 40 CL CLAY <br /> = V <br /> 45 <0.005 <br /> 45 BACKFILL <br /> GL CL CL <br /> 50 _.J S 0.024 (UNCONFINED <br /> 1.0 50 ^--_7 - WATER LEVEL <br /> 0.005 RISE) <br /> <0 SC/sM':� ML <br /> _ L ' 020' SC/SM SC/SM 55 <br /> 55 _. n WATER LEVEL <br /> <0.005 (CONFINED) z r z <br /> a <br /> a 3 <br /> 60 :�M,.,; SM 60 — EXTENT OF o m <br /> PROPOSED " <br /> ML/CL ML/CL EXCAVATION a a <br /> 65 CSCREENED N e <br /> Cl 65 INTERVAL <br /> 70- 7 <br /> pU° ANALYTICAL DATA y�,� �p <br /> �go � <br /> O N H p <br /> 75 75 I= ESTIMATED EXTENT OF PETROLEUM LL $ <br /> HYDROCAR80N5 IN SOIL " <br /> $0 ? �� - CL ff (TOTAL BTEX >0.020 mg/kg; i <br /> 80 TPH-G >1.0 mg/kg} g <br /> ? - 29$ = TOTAL BTEX CONSTITUENTS / <br /> 85 85 (mg/kg) <br /> CL 3,030 = TPH-G (mg/kg) FIGURE <br /> 90 - 90 <0.50= MTBE (mg/kg) 5 <br /> 5M 10 6 <br /> 95 95 SCALE IN FEET 71•N0, <br /> 3024F12 <br />