Laserfiche WebLink
CONDOR EARTH GEOLOGICAL L O G <br /> TECHNOLOGIES, INC. <br /> PROJECT NO.: 3024 DATE. I2/11101 TD: 63.0' <br /> GP-7 SURF. COND.: Asphalt ELEV: ELEV. REF.: <br /> LOGGED 8Y: L. Morse WELL CONSTRUCTION SPECS <br /> PROJECT: CSUS Stockton Multi-Campus DRILL EQUIP.: Geoprobe 6600 DP TOTAL.CASING DEPTH: NIA <br /> FLUSH: NIA STICKUP: NIA <br /> CLIENT: CSUS Stockton HAMMER WT./FALL: N/A CASING DIA.: NIA TYPE: N/A <br /> LOCATION: Intersection, Flora&Aurora Streets HAMMER TYPE: NIA SLOT SZ.: N/A SAND SZ: NIA <br /> SCREEN INT.; N/A <br /> DRILLER: Fisch Environmental GW DEPTH: N/A SAND INT.: NIA <br /> BENT. INT,: N/A <br /> C-57 NO.: HOLE DIA.: 1.5" GROUT INT.: NIA <br /> ter' a z jr. O cn WELL <br /> aSOIL DESCRIPTION REMARKS CONSTRUCTION <br /> 0 r¢ z m O z o DIAGRAM <br /> Asphalt <br /> 5 <br /> 70 <br /> 75 ESM SM. SU TY SAND;Moderate yellowish PTD=2.4 ppm <br /> l brown,medium to coarse grained, dry <br /> CL CL. CLAY; Moderate yellowish brown, moist PID=2.4 ppm <br /> 20 <br /> GP7- <br /> 24 <br /> CL CL: CLAY;Moderate yellowish brown,moist PID=0 Ppm <br /> 25 <br /> No sample recovered <br /> as <br /> r <br /> NOTES: PID=Photoionization detector DP =Direct Push ppm= Parts per million <br /> GP-7 backfilled with neat cement <br /> PG. 1 OF 2 <br />