Laserfiche WebLink
CONDOR EARTH GEOLOGICAL LOG <br /> TECHNOLOGIES, INC. <br /> PROJECT NO.: 3024 DATE: 12/11/01 TD: 61.0' <br /> GP-8 SURF. COND.: Asphalt ELEV: ELEV. REF.: <br /> LOGGED BY: L.Morse WELL CONSTRUCTION SPECS <br /> PROJECT: CSUS Stockton Multi-Campus DRILL EQUIP.: Geoprobe 6640 DP TOTAL CASING DEPTH. NIA <br /> -- FLUSH: NIA STICKUP: N/A <br /> CLIENT: CSUS Stockton HAMMER WT./FALL: NIA CASING DIA.: N/A TYPE: NIA <br /> LOCATION: Intersection,Flora&Aurora Streets HAMMER TYPE: NIA SLOT SZ.: N/A SAND SZ,: NIA <br /> SCREEN INT.: N/A <br /> DRILLER: Fisch Environmental GW DEPTH: N/A SAND INT.: NIA <br /> BENT. INT.: NIA <br /> C-57 NO.: HOLE DIA.: 1.5" GROUT INT.: NIA <br /> LU va Q� v WELL <br /> � d O z p SOIL DESCRIPTION REMARKS CONSTRUCTION <br /> < m 0 w -' DIAGRAM <br /> a <br /> Asphalt <br /> 5 <br /> 10 <br /> 15 <br /> CL CL. CLAY WITH SAND;Moderate yellowish PID—36 ppm at 21' <br /> 20brown,moist,grayish olive at 20.5' No hydrocarbon odor at <br /> 19',slight hydrocarbon <br /> odor at 2I' <br /> CL CL: CLAY;Light olive gray,moist PID= 14.4 ppm <br /> 25 Slight hydrocarbon <br /> GP8- odor <br /> 2s <br /> SC SC: CLAYEY SAND;Moderate yellowish PID=372 ppm <br /> 30 brown,fine grained,moist Strong hydrocarbon <br /> GP& odor <br /> 31 <br /> NOTES: PID =Photoionization detector DP =Direct Push ppm= Parts per million <br /> GP-8 backfilled with neat cement <br /> PG. 1 OF 2 <br />