My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011955
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:56 AM
Creation date
5/28/2020 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011955
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Problem Assessment Work Plan } <br /> I <br /> 4 CWS—Multi-Campus Regional Center <br /> January 23,2003 <br /> Page-7. <br /> i a short duration, as described. Once completed in the described time frame, only the site monitor wells will <br /> be present on-site. No other obvious impacts to the site will be present. <br />{{ Alternative two includes soil vapor extraction (SVE) and groundwater pump and treat, which will be <br /> { <br /> combined to reduce residual contamination in soil and groundwater at the source area. The vapor extraction <br /> system will remove soil vapors from soil in the area of the former tank excavation. Soil vapors will be <br /> removed from the subsurface through SVE wells and combusted in a thermal oxidizer. Condensate from the <br /> 1 extraction system will be processed through activated carbon canisters used for the groundwater pump and <br /> treat system and released to the sanitary sewer. An SVE pilot test will be required to determine the number <br /> and location of SVE wells needed to remove the hydrocarbons in the soil. <br /> Groundwater will be extracted from wells to be installed to a depth of approximately 65 feet;bgs. <br /> Groundwater will be pumped at a rate to capture the plume and to draw down the aquifer in the vicinity of <br /> the wells to a depth of approximately 55 feet bgs. This will enable the SVE system to:draw hydrocarbon ' <br /> c <br /> yapors from the previously saturated soils, thus enhancing the effectiveness of the SVE'in remediating the <br /> :1 <br /> site. An aquifer pump test will be required to determine the number and location of wells and the pumping <br /> j rate deeded to accomplish the desired results. Extracted groundwater will be processed through carbon ti t. <br /> I canisters and released to the sanitary sewer. This alternative is justified because it will reduce the level of V,t <br /> contamination in the soil and groundwater to minimize the potential impact to the beneficial use of <br /> groundwater. The time to arrange logistics and complete the remediation is estimated to be 18 to 24 <br /> months. <br /> I< I <br /> During the SVE and pump and treat remediation, a moderate amount of site disruption will be necessary. <br /> The SVE and carbon treatment equipment will be housed in a small fenced area. All piping for the system <br /> it :will in closed trenches. The remediation equipment will typically be continuously noisy. <br /> t The no action alternative would involve no active remediation efforts. The subsurface contamination would <br />! be allowed to degrade naturally in place. The plume could be monitored to evaluate mobilization of <br /> contaminants. This alternative may be justified because the source of contamination is relatively isolated <br /> (under an asphalt cap) and of moderate concentration, such that it may not pose a significant threat'to the <br /> public from the potential pathways of direct inhalation. Risk Based Corrective Action(RSCA), including <br /> :Tier II analyses (involving additional site sampling), would be required, however, to evaluate the risk'to the <br /> public from site contamination- Time for remediation by this method could take decades and would require <br /> ;,continued quarterly monitoring until closure is received. <br /> 6.2 COMPARATIVE COST ANALYSIS <br /> I Preliminary'cost estimates for the first and second alternatives are presented in Table' C and Table Din. <br /> ..Appendix B. These are general estimates for comparison purposes only and are not based on actual <br /> monitoring and reporting requirements, which may change with conditions. The accuracy of these estirnates <br /> should be considered no better than within 25-50% of the true costs. Estimated costs for soil' over- <br /> excavation and removal are approximately $583,000. Estimated costs for the SVE and,groundwater pump <br /> and treat alternative are approximately $304,000. There are no remediation costs associated with the no <br /> action alternative other than RSCA and possible additional monitoring costs associated with intrinsic <br /> bioremediation testing, etc. x <br /> t <br /> F <br /> I - " <br /> I <br />! , « CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.