My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011955
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:56 AM
Creation date
5/28/2020 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011955
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{, Problem Asscssment Wak Plan <br /> CSUS-Multi-Campus R4cnal Center <br /> E January 23,2003 <br /> Page 10 <br /> 9.0 PROJECT SCHEDULE <br /> Upon approval of this PAWP by CSUS, Condor can submit the PAWP to the S3CEHD and CRWQCB. <br /> Upon notification from CSUS to proceed, the direct push field portion of the investigation can be completed <br /> within approximately four to six weeks. The turn-around time for laboratory analyses is approximately two <br /> weeks. An addendum to this PAWP with Condor's recommendations for the installation of additional <br /> monitor wells can be prepared and submitted to CSUS within two weeks of receipt of the laboratory <br /> 3 analyses. Monitor wells can be installed within approximately two to foie' weeks after the number and <br /> location of new monitor wells is approved by CSUS. Development and sampling of the monitor wells can <br /> be completed within approximately one week after completion of the monitor well installation. The turn- <br /> around time for laboratory analyses is approximately two weeks. A PAR can be submitted within three <br /> weeks of receipt of the laboratory analyses. If you need additional information or have any questions, <br /> please call us at(204) 234-0518. <br /> J1 Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. +� G <br /> moo` <br /> No. 6430 <br /> "Lee H. Morse Donald F. Kresse r. <br /> Associate Geologist California Registered <br /> E� .-Geologist#6430 OF O,gLI <br /> I� <br /> ,l <br /> t <br /> t <br /> # PM024 CSUS-Multi-Campus\Work PlanTrohlem Assessment WcTk Plan\PAWP.doc <br /> `� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.