Laserfiche WebLink
{, Problem Asscssment Wak Plan <br /> CSUS-Multi-Campus R4cnal Center <br /> E January 23,2003 <br /> Page 10 <br /> 9.0 PROJECT SCHEDULE <br /> Upon approval of this PAWP by CSUS, Condor can submit the PAWP to the S3CEHD and CRWQCB. <br /> Upon notification from CSUS to proceed, the direct push field portion of the investigation can be completed <br /> within approximately four to six weeks. The turn-around time for laboratory analyses is approximately two <br /> weeks. An addendum to this PAWP with Condor's recommendations for the installation of additional <br /> monitor wells can be prepared and submitted to CSUS within two weeks of receipt of the laboratory <br /> 3 analyses. Monitor wells can be installed within approximately two to foie' weeks after the number and <br /> location of new monitor wells is approved by CSUS. Development and sampling of the monitor wells can <br /> be completed within approximately one week after completion of the monitor well installation. The turn- <br /> around time for laboratory analyses is approximately two weeks. A PAR can be submitted within three <br /> weeks of receipt of the laboratory analyses. If you need additional information or have any questions, <br /> please call us at(204) 234-0518. <br /> J1 Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. +� G <br /> moo` <br /> No. 6430 <br /> "Lee H. Morse Donald F. Kresse r. <br /> Associate Geologist California Registered <br /> E� .-Geologist#6430 OF O,gLI <br /> I� <br /> ,l <br /> t <br /> t <br /> # PM024 CSUS-Multi-Campus\Work PlanTrohlem Assessment WcTk Plan\PAWP.doc <br /> `� CONDOR <br />