Laserfiche WebLink
I b <br /> I <br /> i <br /> TABLE OF CONTENTS <br /> k <br /> 1.0 INTRODUCTION...................................................:......................................................................1 <br /> BACKGROUND ............................................................................ <br /> 2.0 PROJECT ••••.........................1 <br /> 3.0 DIRECT PUSH BORING FIELD PROCEDURES......................................................................3 <br /> 3.1 SITE PREPARATION...................................................................................................................3 <br /> '.' 3.2 DIRECT PUSH BORING PROCEDURES ....................................................................................3 <br /> 4.0 MONITOR WELLS —FIELD METHODS..................................................................................4 <br /> ................ <br />' <br /> 11 4.1 SITE PREPARATION........................ ••••4 <br /> 4.2 DRILLING PROCEDURES ..........................................................................................................4 <br /> 4.3 MONITOR WELL SURVEYING, DEVELOPMENT, ANDSAMPLING.....................................4 <br /> 5.0 LABORATORY ANALYSES.......................................................................................................5 <br /> 6.0 REMEDIAL FEASIBILITY EVALUATION................................................ ........................6 <br /> 6.1 DESCRIPTIONS, JUSTIFICATIONS, AND TIME,FOR PROPOSED CORRECTIVE ACTION <br /> STRATEGIES ••..6 r <br /> 6.2 COMPARATIVE COST ANALYSIS ......................... ...... 7 <br /> . � I <br /> 6.3 EVALUATION OF ALTERNATIVES ...........................8 <br /> 6.4 PROPOSED TARGET CLEAN-UP LEVELS AND VERIFICATION PROCEDURES................. I <br /> r <br /> 7.0 SUMMARY AND CONCLUSIONS................................................................ ............... ' ......9 <br /> -8.0 REPORTING............................... ..............................................................................................9 , <br /> i;9.0 PROJECT SCHEDULE...................................... ....................................................................10 <br />' APPENDICES ; <br /> :APPENDIX A <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Map with Proposed Direct Push Boring Pair Locations <br /> 'APPENDIX B <br /> i Table A Historical Groundwater Sample Analytical Data <br /> Table B Historical Soil Sample Analytical Data <br /> I Table C Itemized Cost Analysis for Excavation and Removal Alternative <br /> Table D Itemized Cost Analysis for SVE and Groundwater Pump and Treat Alternative <br /> E � <br /> I <br /> i <br /> i; <br /> i n CONDOR <br />