My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011955
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:56 AM
Creation date
5/28/2020 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011955
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Problem Assessment Work Plan <br /> CSUS-Multi-Campus R46nal Center <br /> January 23,2043 <br /> Page-5• <br />{ f <br /> :0.01 foot and horizontal accuracy of 1.0 foot. The measuring point for water-level measurements will be <br /> 'marked on each well collar. <br /> IAt least 48 hours following construction, the monitor wells will be developed by surging and bailing the <br /> groundwater in each well until the discharge water is relatively free of sediment (clear to the unaided eye). <br /> i The monitor wells will be purged until the temperature, electrical conductivity, and pH of the water has <br /> a stabilized. All well-development equipment will be cleaned prior to use in each well by washing in a <br /> solution of laboratory-grade, non phosphate detergent and de-ionized water, and double rinsing with de- <br /> .ionized water. The purge water discharged from the wells during development will be placed in 55,`gallon <br /> -drums, sealed, labeled, and left on-site pending results of laboratory analyses. <br /> ..Groundwater samples will be collected at least 48 hours following development of the monitor wells. Prior <br /> to sample collection, the static water level in each well will be measured to the nearest 0.01-foot;with a l <br /> battery-operated, water level meter. A disposable bailer will be lowered into each well to check for floating <br /> product, petroleum odors, and/or sheen. if floating product is present, the thickness, will be measured. <br /> Laboratory samples will not be collected from wells that contain floating product. <br /> The monitor wells will be purged using a clean, disposable bailer or a Teflon® and stainless steel <br /> submersible pump until the temperature, electrical conductivity, and pH of the water has stabilized At least <br /> ".three casing volumes of water will be purged from each monitor well. The purged water,from each well will � <br /> °be placed in 55-gallon drums, sealed, labeled, and left on-site pending results of laboratory analyses.'` <br /> Each well will be allowed to recover to at least 80% of its pre-purge water level before sampling. However, <br /> if any of the monitor wells does not recover to at least 80% of its pre-purge water level by the end of the <br /> slay of the purge (standard workday), the monitor well will be sampled at that time and the percent recovery <br /> ;noted The groundwater samples will be collected with clean, disposable bailers or a Teflon® and stainless ' <br /> ,steel submersible pump. Each water sample will be gently drained from the bailer or filled from the pump <br />' discharge line at very low flow into the appropriate laboratory supplied containers. The sample containers t <br /> will be sealed, labeled, placed in a cooler chilled with ice, and delivered under chain-of-custody procedures <br /> ij to a California certified laboratory for analyses. <br /> I ,5.0 LABORATORY ANALYSES <br /> The groundwater samples collected from the borings and monitor wells will be analyzed for total petroleum 1 <br /> - hydrocarbons quantified as gasoline (TPH-G) and for total petroleum hydrocarbons:(TPH) quantified as } <br /> kerosene, diesel, and motor oil by EPA Method 8015M; for benzene, toluene, ethyl benzene, and total <br /> xylenes (BTEX) by EPA Method 8020; and for gasoline oxygenates/additives by EPA Method 8260. The <br /> gasoline oxygenates/additives include Methyl tertiary-Butyl Ether (MTBE), ethanol, tertiary-Butanol, Di- <br /> isopropyl ether (D1PE), Ethyl tertiary-Butyl Ether (ETBE), tertiary-amyl Methyl Ether (TAME), 1,2- <br /> Dibromoethane, and 1,2-Dichloroethane (1,2-DCA). The samples will be delivered under chain-of-custody <br /> i procedures to a California certified laboratory for analysis. The analytical methods and analytical detection <br /> „limits arep resented in Table 1. <br />� � t <br /> Cw 4 <br /> t�• <br /> A CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.