SITE BACKGROUND <br /> The Site contained three underground storage tanks (USTs) associated with past uses of the Site. On July <br /> 22, 1998 Henderson Construction of Stockton, California removed all three USTs from the Site, each <br /> from a separate excavation. A fuel dispenser island was also removed. Tank 6 (TK6)reportedly contained <br /> fuel oil for a generator room. Tank 10 (TK10) was reportedly a 10,000-gallon capacity UST formerly <br /> containing diesel fuel. Tank 11 (TK11) was reportedly a 1,000-gallon capacity UST formerly containing <br /> gasoline. TK10 and TKI I were located adjacent to the north and south end, respectively,of the former <br /> ' fuel dispenser island. TK6 was Iocated approximately '100 feet southeast of TK10; TK 11, and the.fuel <br /> dispenser island. ` <br /> On July 23, 1998, a Condor representative was on-Site to collect soil samples from the excavations under <br /> the direction of Ms. Letitia Briggs of the San Joaquin County Environmental Health Department <br /> (SJCEHD). The soil samples were analyzed by APCL of Chico, California, Henderson Construction <br /> prepared a brief letter report, dated August 31, 1998, describing the UST removal activities, soil sampling <br /> activities, and laboratory analytical results of the soil samples. <br /> Field observations and the laboratory analytical results_ of the soil samples indicated that further <br /> subsurface investigation of the TK6 and TK11 excavations was not necessary. Field observations and the <br /> 1 laboratory analytical results of the soil samples collected from beneath the former location of TK10, <br /> however, indicated the presence of diesel range petroleum hydrocarbons. <br /> In a letter dated April 28, 2000, the SJCEHD requested the submittal of a work plan to investigate the <br /> lateral and vertical extent of contamination at the Site. At the request of California State University at <br /> Stanislaus (CSUS), Condor subsequently prepared and submitted the Work Plan for Soil and <br /> Groundwater Sampling by Direct Push (Geoprobe), dated June 21, 2000. In a letter dated July 7, 2000, <br /> Ms. Carol Oz of the SJCEHD approved the work plan (with modifications) and requested that the work <br /> be conducted within 90 days and that a report of findings be submitted within 60 days of work <br /> completion. <br /> { <br /> j On December 28 and 29, 2000, Condor.conducted a limited soil and groundwater investigation utilizing <br /> Geoprobeg direct push technology at the Site. Condor prepared the Preliminary Investigation and <br /> Evaluation Report (PIER), dated February 7, 2001, describing the results of the work. Laboratory <br /> analytical results of the soil and groundwater samples and field observations indicated that petroleum <br /> hydrocarbons were present in Site soil and groundwater down to the approximate total depth of the <br /> investigation (36 feet below grade). Based on the results of the investigation, Condor recommended the <br /> installation of three cone penetrometer (CPT) borings to investigate the Site geology, three direct push <br /> ` borings to collect soil samples, and three Hydropunch borings to collect discrete groundwater samples at <br /> depths to be determined by the results of the-CPT borings. The purpose of borings was to continue with <br /> evaluation of the vertical and horizontal distribution of petroleum hydrocarbon impacted soil and <br /> groundwater at the Site. Condor also recommended the installation of three groundwater monitor wells to <br /> establish the groundwater gradient and to monitor the concentrations of petroleum hydrocarbons in Site <br /> groundwater. In addition, Condor recommended the completion of a sensitive receptor survey (SRS) <br /> { within a radius of 2,000 feet of the Site to investigate the potential for receptors that may be impacted by <br /> �. petroleum hydrocarbons in the groundwater. <br /> In a letter dated April 4, 2001, to Mr. Cliff Bailey of CSUS, Ms. Dot Lofstrom of the SJCEHD concurred <br /> with the recommendations contained in the PIER. At the request of Mr. David Rosso for the Trustees of <br /> the California State University, Condor prepared the Work Plan - Additional Soil and Groundwater <br /> I <br />