Laserfiche WebLink
SCSA-University Park <br /> 1 ` ' Site Background <br /> i <br /> Page 4 <br /> On August 10, 2004, a Condor representative was on Site to conduct the third quarter 2004 quarterly <br /> groundwater monitoring event. Field observations indicated that no separate phase petroleum, sheen or, <br /> t odor was noted in the groundwater recovered from the wells. The average depth to groundwater in the <br /> monitor wells was 41.40 feet below the surveyed well collar measuring points (the measuring points are <br /> s slightly below the ground surface). The average groundwater elevation measured in the monitoring wells <br /> decreased 2.50 feet between March 13, 2003, and August 10, 2004. The estimated groundwater gradient <br /> for the Site on August 10, 2004, was 0.0023 ft/ft to the south. The groundwater gradient direction (south) <br /> is the southern-most gradient direction estimated for the Site during the brief monitoring history. Historic <br /> gradient directions have ranged from approximately due east to approximately due south. The Site water <br /> table elevation decreased relatively steadily from approximately 20 feet below mean sea level to <br /> approximately 24 feet below mean sea level during the Site monitoring history (December 2001 to <br /> f August 2004). The laboratory analytical results of the groundwater samples collected from MW-1, MW- <br /> 2, and MW-3 on August 10, 2004, were generally consistent with the historic laboratory analytical results. <br /> On November 10, 2004, a Condor representative was on Site to conduct the fourth quarter 2004 quarterly <br /> groundwater monitoring event. Field observations indicated that no separate phase petroleum or sheen <br /> was found in any of the monitoring wells. Moderate to strong odor was noted in groundwater recovered <br /> }. from MW-2 and MW-3. The average depth to groundwater in the monitor wells was 42.76 feet below the <br /> surveyed well collar measuring points (the measuring points are slightly below the ground surface). The <br /> average groundwater elevation measured in the-monitoring wells decreased 1.36 feet between August 10, <br /> 2004 and November 10, 2004. The estimated groundwater gradient for the Site on August 10, 2004, was <br /> 0.0018 ft/ft to the southeast. Historic gradient directions have ranged from approximately due east to <br /> approximately due south. The Site water table elevation decreased relatively steadily from approximately <br /> 20 feet below mean sea level to approximately 25 feet below mean sea level during the Site monitoring <br /> v--� history (December 2001 to November, 2004). The laboratory analytical results of the groundwater <br /> { samples collected from MW-1, MW-2, and MW-3 on November 10 and 11, 2004 were generally <br /> consistent with the historic laboratory analytical results. <br /> As the plan for Site development was modified and clarified during 2003, very aggressive and timely but <br /> less cost-effective Site remediation (over-excavation, as proposed in the above described March 3, 2003 <br /> work plan) was no longer considered necessary by the SCSA. Condor, on behalf of the SCSA, proposed <br /> evaluation of Site source area remediation by pilot testing of air-sparging in combination with soil vapor <br /> extraction in a work plan dated September 15, 2004. In a letter dated November 8, 2004, Mr. Henderson <br /> of the SJCEHD expressed concern with two aspects of the proposed approach and requested submittal of <br /> a work plan addendum by January 17, 2005, addressing his concerns. Concurrently, Site development <br /> plans continued to evolve such that a structure planned for the Site vicinity was to be located well away <br /> ' from the Site contaminant source area and that a parking lot for the structure would be built over the Site <br /> source area. These considerations indicated the potential for consideration of less aggressive Site <br /> remediation techniques. <br /> As a result of the above considerations a meeting was held on December 17, 2004, with all concerned <br /> parties in attendance. As a result of the meeting it was agreed that Condor would prepare a work plan for. <br /> 1 additional groundwater investigation and feasibility evaluation of various remediation options for the Site. <br /> In an email transmission on January 6, 2005, to Mr. Henderson at the SJCEHD, Condor requested an <br /> { extension of the work plan submittal due date back to February 4, 2005. Mr. Henderson approved the. <br /> extension in a return email on January 6, 2005. Condor subsequently prepared and submitted the <br /> Additional Groundwater Investigation and Remediation Feasibility Evaluation Work.Plan, dated January <br /> 25, 2005. The above-mentioned work plan was then submitted on February 7, 2005. The work plan was <br /> conditionally approved in a letter received by Condor from the SJCEHD on April 8, 2005. Condor is <br /> currently conducting project cost estimation and planning activities. <br /> k <br /> .. j <br />