My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011957
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:33 AM
Creation date
5/28/2020 9:56:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011957
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YYa <br /> L Second Quarter 2005 Quarterly Groundwater Monitoring Report <br /> Stockton Center Site Authority—University Park <br /> June 13,2005 <br /> Page 5 of 6 <br /> d <br /> evaluation of Site source area remediation.by pilot testing of air-sparging in combination with soil vapor <br /> extraction in a work plan dated September 15, 2004. In a letter dated November 8, 2004, Mr. Henderson <br /> of the SJCEHD expressed concern with two aspects of the.-proposed approach and requested submittal of <br /> a work plan addendum by January 17, 2005, addressing his concerns. Concurrently,. Site development <br /> j plans continued to evolve such that a structure planned for the Site vicinity was to be located well away <br /> from the Site contaminant source area and that a parking lot for the structure would be built over the Site <br /> source area. These considerations indicated the potential for consideration of less aggressive Site <br /> remediation techniques. <br /> As a result of the above considerations a meeting was held on December 17, 2004, with all concerned <br /> parties in attendance. As a result of the meeting it was agreed that Condor would prepare a work plan for <br /> E additional groundwater investigation and feasibility evaluation of various remediationoptions for the Site. <br /> 1 Condor subsequently prepared and submitted the Additional Groundwater Investigation and Remediation <br /> Feasibility Evaluation Work Flan, dated January 25, 2005. The above-mentioned work plan was then <br /> submitted on February 7, 2005. The work plan was conditionally approved in a letter:received by Condor <br /> from the SJCEHD on April 8, 2005. Condor is currently conducting project cost estimation and planning <br /> activities. <br /> - LIMITATIONS AND SIGNATURE <br /> Condor has endeavored to determine as much as practical about the Site within our scope of services <br /> using accepted principles and professional practice at the time the work was performed. Condor's <br /> involvement in the work performed for this report has been limited to collecting and recording system <br /> measurements and parameters; collecting and shipping samples; compiling field data and data provided <br /> by analytical laboratories; and interpreting field and laboratory data. Condor makes no representation as <br /> to the subsurface conditions at locations or times other than those sampled by our employees and reported <br /> in this document. Condor is not responsible for the accuracy and completeness of information collected <br /> and developed by others. <br /> This report was prepared by Condor under the direct supervision of a Professional Geologist in the State <br /> of California. The report was prepared at the request of, and is for the sole use of, the SCSA. If any <br /> changes are made or errors found in the information used for this report, the :interpretations and <br /> conclusions contained herein shall not be considered valid unless the changes or errors are reviewed by <br /> Condor and either appropriately modified or re-approved in writing. The contents of.this report may not <br /> be used or relied upon by any other person(s)without the express written consent and authorization of the <br /> SCSA and Condor. Any questions regarding the content of this document should be addressed to Don <br /> Kresse at(209) 234-0518. <br /> Respectfully Submitted, <br /> CONDOR EARTH TECHN LOGIES, D Geo <br /> F. <br /> ereasa A. Jones No 08 Donald F.Kresse, F.G., C.Hg., REA <br /> Staff Geologist m ® Senior Environmental Hydrogeologist <br /> 4M <br /> LA CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.