;S <br /> Y . <br /> Additional Groundwater Investigation and Remediation Feasibility Evaluation Work Plan <br /> Stockton Center Site Authority-University Park <br /> January 25,2005 <br /> 1 Page 8 <br /> l� <br /> The drill cuttings and steam cleaning efflucnt will be placed in DOT-approved 55-gallon drums, sealed, <br /> A labeled, and left on-site pending laboratory analyses. Condor can assist the SCSA with removal of the soil <br /> J and water, if requested. <br /> 5.5 SHALLOW MONITORING WELL CONSTRUCTION <br /> The shallow monitoring well located in the source area will be constructed with 15 feet of 4-inch outside <br /> diameter, Schedule 40, flush-threaded, machine-slotted PVC screen (slot size 0.020). The two down <br /> gradient monitoring wells, located east and southeast of the source area, will be constructed with 15 feet <br /> of 2-inch outside diameter, Schedule 40, flush-threaded, machine-slotted PVC screen (slot size 0.020). <br /> Flush-threaded PVC bottom caps will be placed at the bottom of the screen sections. Blank PVC casing <br /> k will be installed above the screens to the ground surface. <br /> A filter pack of#3 Monterey sand will be placed in the annular space to approximately two feet above the <br /> screen while the augers are in place. The depth of the sand in the well annulus will be monitored with a <br /> Y weighted tape measure while the sand is being placed and the augers are being gradually retracted to <br /> avoid bridging. To form a protective seal, approximately three feet of bentonite chipswill be installed <br /> above the sand. The depth of the chips in the well annulus will be monitored with a weighted tape <br /> t measure while the chips are being placed and the augers are being gradually retracted to avoid bridging. <br /> . The bentonite chips will be hydrated with potable water. The chips will be allowed to hydrate for at least <br /> 20 minutes, and a surface seal grout mixture of Type I/H neat cement containing less than 5% bentonite <br /> �p4 solids will be pumped via a tremie pipe into the annulus and will extend from the bentonite to the ground <br /> surface. Depending on the stability of the boreholes, the augers may be removed before or during <br /> emplacement of the grout. The tremic pipe will remain near the top of the bentonite seal until the pumped <br /> grout is forced to the surface. The monitoring wells will be completed with locking traffic boxes. <br /> 5.6 MONITORING WELL SURVEYING,DEVELOPMENT,AND SAMPLING <br /> k Condor's licensed land surveyor will determine the location and relative elevation of the well.collars <br /> following the installation of the monitoring wells. The well collars will be surveyed with a vertical <br /> accuracy of 0.01 foot and horizontal accuracy of 1.0 foot. The measuring point for water-level <br /> measurements will be marked on each well collar. The groundwater gradient will be estimated using the <br /> survey information and the depth to water measurement in each well. <br /> At least 48 hours following construction, the monitoring wells will be'developed by surging and bailing <br /> the groundwater in each well until the discharge water is relatively free of sediment (clear to the unaided <br /> { eye). The monitoring wells will be purged until the temperature, electrical conductivity and pH of the <br /> water has stabilized. All well-development equipment.will be cleaned prior to use in each well by <br /> washing in a solution of laboratory-grade, non-phosphate detergent and de-ionized water, and double <br /> rinsing with de-ionized water. The purge water discharged from the wells during development will be <br /> # placed in 5 5-gallon,drums, sealed, labeled, and left on-site pending results of laboratory analyses. <br /> Groundwater samples will be collected at least 48 hours following development of the monitoring wells. <br /> Prior to .sample collection, the static water level in each well will be measured to the nearest 0.01-foot <br /> with a battery-operated, flat tape water level meter. A disposable bailer will be lowered into each well to <br /> check for floating product,petroleum odors, and/or sheen. If floating product is present,the thickness will <br /> be measured. Laboratory samples will not be collected from wells that contain floating product. <br /> � The monitoring wells will be purged using a clean, disposable bailer until the temperature, electrical <br /> conductivity, and pH of the water has stabilized.. At least three casing volumes of water will be purged <br /> �«1 CONDOR <br /> 4. . <br />