Laserfiche WebLink
ii <br /> CONDOR EARTH TECHNOLOGIES INC <br /> 188 Frank West"Circle Suite I i <br /> Stockton CA 95206 <br /> ? Phone 209.234.0518 <br /> CO�i DOR <br /> p FAX 209.234.053$ <br /> 1 ti L Ci www.condorearth.com <br /> i <br /> D �� <br /> V` ��LJ I <br /> AOR — 5 2005 . <br /> March 2,2005 ENVIRONMENT.HEALTH <br /> PEr"viiT/SERVICES <br /> Mr.David Rosso <br /> Stockton Center Site Authority CONDOR PROJECT NO.3024A <br /> 401 Golden Shore, 2nd Floor i <br /> Long Beach, CA 90802-4210 <br /> + cc: . Mr. Steve Escobar, City of Stockton Planning Department <br /> Mr.Art Hand, Stockton Ui►ified School District <br /> Mr.James Barton, CRWQCB <br /> Mr. Nuel Henderson,Jr., SJCEHD <br /> Mr. Dan Keyser, GrupeCommunities,Inc. <br /> SUBJECT: FIRST QUARTER GROUNDWATER MONITORING REPORT(FEBRUARY <br /> 2005),UNIVERSITY PARK, 1252 NORTH STANISLAUS STREET,STOCKTON, <br /> CA <br /> Dear Mr.Rosso: <br /> _ t <br /> The results of the first quarter 2005 groundwater monitoring event conducted on February 3 and 4 2005 <br /> at the above-referenced site are included with this report. A summary of the current groundwater <br /> monitoring results is included on page 2. Figures indicating the site location, estimated groundwater <br /> gradient, and laboratory analytical results (Figures 1, 2, and 3, respectively) are attached to this report. <br /> Also attached are site background information, historical monitoring data, field forms, and the laboratory <br /> analytical report (groundwater sample analytical results and chain-of-custody record). This report has <br /> been submitted to the above-referenced parties.. <br /> i <br /> 1 <br /> ' 3 <br /> F <br /> r <br />