My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011959
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:05:01 AM
Creation date
5/28/2020 9:57:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011959
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Quarter 2005 Quarterly Groundwater Monitoring Report <br /> Stockton Center Site Authority—University Park <br /> March 2,2005 <br /> Page 5 of 6 <br /> extraction in a work plan dated September 15, 2004. In a letter dated November 8, 2004, Mr. Henderson <br /> of the SJCEHD expressed concern with two aspects of the proposed approach and requested submittal of <br /> a work plan addendum by January 17, 2005, addressing his concerns. Concurrently, site development <br /> plans continued to evolve such that a-structure planned for the site vicinity was to be located well away <br /> from the site contaminant source area and that a parking lot for the structure would be built over the site <br /> source area. These considerations indicated the potential for consideration of less aggressive site <br /> remediation techniques. <br /> ' As a result of the above considerations a meeting was held on December 17, 2004, with all concerned <br /> parties in attendance. As a.result of the meeting it-was agreed that Condor would prepare a workplan for <br /> additional groundwater investigation and feasibility evaluation of various remediation options for the site. . <br /> In an email transmission on January 6, 2005, to Mr. Henderson of the SJCEHD, Condor requested an <br /> extension of the work plan submittal due date to February 4, 2005. Mr. Henderson approved the extension <br /> in a return email on January 6, 2005. The above-mentioned work plan was then submitted on February 7, <br /> 2005. Approval of the work plan by the SJCEHD is pending. <br /> # LIMITATIONS AND SIGNATURE <br /> Condor has endeavored to determine as much as practical about the site within our scope of services using <br /> accepted principles and professional practice at the time the work was performed. Condor's involvement <br /> { in the work performed for this report has been limited to collecting and recording system measurements <br /> and parameters; collecting and shipping samples; compiling field data and data provided by analytical <br /> laboratories; and interpreting field and laboratory data. Condor makes no representation as to the <br /> subsurface conditions at locations or times other than those sampled by our employees and reported in <br /> this document. Condor is not responsible for the accuracy and completeness of.information collected and <br /> _ developed by others. <br /> i <br /> 4M <br /> CONDOR <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.