Laserfiche WebLink
A. <br /> Soil Vapor Extraction and Air Sparge Feasibility Evaluation Work Plan <br /> University Park <br /> {' September 15,2004 <br /> Page 5 <br /> (ATC) permit is required for a pilot test provided that the pilot test is no longer than five days in duration. <br /> t However, an ATC permit will be required for construction of the final SVE system. At least 48 hours <br /> prior to implementation of the pilot test, Condor will notify the SJVAPCD and the SJCEHD. <br /> 4.1 SVE PILOT TEST PROCEDURES <br /> i <br /> The SVE pilot test is anticipated to operate for minimum of 24 hours. Pilot testing will be conducted� , <br /> utilizing the SVE well installed southwest of the former UST excavation as the extraction well. <br /> Monitoring wells MW-1, MW-2, MW-3, and two additional SVE wells will be used for pilot test <br /> observation points. <br /> During the pilot test of the SVE well, periodic measurements will be made of vacuum at the extraction <br /> well and the observation wells. Depth to water measurements will be made at MW-3, the observation well <br /> nearest the SVE extraction well being tested at the start of, and just prior to the end of, the pilot test. <br /> Periodic measurements of organic vapor concentrations will be made of the vapor influent to the blower <br /> r <br /> and of the effluent from the carbon canisters using a PID. Periodic measurements of the percentage of <br /> oxygen in the influent vapor will be measured with an oxygen meter. An airflow meter installed'in the <br /> f vacuum line between the SVE well being tested and the blower will monitor airflow rates. <br /> {. 4.2 VAPOR LABORATORY ANALYSES <br /> E _ <br /> A soil vapor sample will be collected for laboratory analyses from the wellhead of the SVE well used as <br /> an extraction well at the beginning of, and prior to the completion of the long-term pilot test. <br /> {" Concurrently, vapor concentrations will be measured.with a PID for correlation. In addition, one field <br /> blank will be collected during the sampling at the SVE extraction well. A maximum of three 4 vapor <br /> X_ samples will be collected during the SVE pilot testing. Each vapor sample will be collected into a1-liter <br /> SUMMA canister. The field blank will be collected by opening the Summa canister to the,ambient air up- <br /> stream of,but in the vicinity of, the test equipment of the SVE well. <br /> The soil vapor samples will be submitted to a California-certified environmental lab for analyses, Each <br /> vapor sample will be analyzed for TPH-G by EPA Method 8015m, for BTEX by EPA Method 8020, and <br /> for gasoline oxygenates/additives by EPA Method 8260B. The gasoline oxygenates/additives will include <br /> 1 MTBE, ethanol, TBA, di-isopropyl ether (DIPE), ethyl tertiary-butyl ether (ETBE), tertiary-amyl methyl <br /> ether (TAME), 1,2-dibromoethane (EDB or 1,2-DBA), and 1,2-DCA. The analytical methods and <br /> analytical detection limits are presented in Table 1, on the following page. <br /> Il. <br /> I <br /> l . <br /> l <br /> 1 <br /> { 4M <br /> CONDOR <br /> l�' I€ <br />