Laserfiche WebLink
CONDOR EARTH GEOLOGICALTECHNOLOGIES, INC. L O G <br /> PROJECT NO.: 3024. DATE: 12/10/01 TD: 45.0' <br /> " MVq V--3 SURF. COND.: AsphaltE1_EV: 17.16' ELEV. REF.: Survey <br /> LOGGED BY: L.Morse WELL CONSTRUCTION SPECS <br /> PROJECT: CSUS Stockton Multi-Campus DRILL EQUIP.: Mobile Drill B-57 TOTAL CASING DEPTH: 4S' <br /> �" FLUSH: X STICKUP: <br /> CLIENT: CSUS Stockton HAMMER WT.IFALL NIA CASING DIA.: 2" TYPE: PVC <br /> LOCATION: Intersection, Flora&Aurora Streets HAMMER TYPE: HSA SLOT SZ.: 0.020 SAND SZ.: 43 <br /> SCREEN INT.: 25'-45' <br /> DRILLER: Woodward Drilling GW DEPTH: 37.42' SAND INT.: 23'-45' <br /> BENT. INT.: 211-23' <br /> C-57 NO.: HOLE DIA.: 9" GROUT INT.: 0'-21' <br /> zLU L x m WELL <br /> U_ � z O D 0O z ¢ U) SOIL DESCRIPTION REMARKS CONSTRUCTION <br /> p < m O w 'r I � DIAGRAM <br /> SP Asphalt Hand auger to 4' <br /> SP: SAND WITH GRAVEL;Moderate <br /> CL brown,medium to coarse grained,fill, dry PID=0 ppm <br /> CL. CLAY; Moderate brown, dry <br /> L" 5 <br /> boo Moderate yellowish brown PID=0 ppm <br /> 10 <br /> PID=0 ppm <br /> rd <br /> 15 Moist PID=0 ppm <br /> 20 <br /> PID=0 ppm =- <br /> LW <br /> 25 <br /> �. PID=0 ppm <br /> a.. �30 <br /> PID=0p m <br /> NOTES: PID=Photoionization detector ppm=Parts per million <br /> HSA=Hollow stem auger <br /> ism PG. 1 of 2 <br />