Laserfiche WebLink
r <br /> i <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION....................................................................................................................:.....1 <br /> 2.4 PROJECT BACKGROUND...................................................................................................:.....1 <br /> 3.0 DIRECT PUSH BORING FIELD PROCEDURES......................................................................3 <br />�. 3.1 SITE PREPARATION.............................................................................................................:.....3 <br /> 3.2 DIRECT PUSH BORING PROCEDURES ...............:....................................................................3 f <br /> 4.4 MONITOR WELLS —FIELD METHODS..................................................................................4 1 <br /> • 4.1 SITE PREPARATION............................................................ ..............................................4 <br /> 4.2 DRILLING PROCEDURES ..........................................................................................................4 <br /> 4.3 MONITOR WELL SURVEYING, DEVELOPMENT,AND SAMPLING.............................:.......4 <br /> 5.4 LABORATORY ANALYSES ................................................................................................. .....5 <br /> i <br /> 6.0 REMEDIAL FEASIBILITY EVALUATION..............................................................................6 <br /> 6.1 DESCRIPTIONS, JUSTIFICATIONS,AND TIME FOR PROPOSED CORRECTIVE ACTION <br /> STRATEGIES -----•.....................................................................................................................•---6 <br /> 6.2 COMPARATIVE COST ANALYSIS ............................................................................................7 <br /> 6.3 EVALUATION OF ALTERNATIVES .......................................................................•---- 8 <br /> 6.4 PROPOSED TARGET CLEAN-UP LEVELS AND VERIFICATION PROCEDURES.................8 i <br /> i <br /> 7.4 SUMMARY.AND CONCLUSIONS........ ........................................................................... ..9 <br /> 8.0 REPORTING............................... ........................... .............................. ......................... ..9 <br /> 9.0 PROJECT SCHEDULE. ................................................ ................................................... .10 <br /> M <br /> APPENDICES <br /> APPENDIX A <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Map with Proposed Direct Push Boring Pair Locations <br /> i APPENDIX B i <br /> Table A Historical Groundwater Sample Analytical Data <br /> Table B Historical Soil Sample Analytical Data <br /> Table C Itemized Cost Analysis for Excavation and Removal Alternative <br /> Table D Itemized Cost Analysis for SVE and Groundwater Purrp and Treat Alternative <br /> r <br /> 1 <br /> coN©OR <br />