Laserfiche WebLink
ISCIOx"WeeniNc <br />' 60 FUTURE ACTIVITIES <br /> There are currently two additional monitoring events scheduled for the three monitoring <br />' wells at the Site hollowing completion of the fourth round of groundwater monitoring and <br /> sampling, if detections of petroleum hydrocarbons have not been reported or have remained <br /> consistent, Versar will recommend Site closure to the appropriate regulatory agencies on behalf <br />' of the Division of the State Architect <br /> The third round of quarterly sampling is scheduled for December 1996 and will include <br /> the following tasks <br />' 0 Recording water-level measurements from the three monitoring wells, <br /> • Sampling the groundwater in the three monitoring wells and laboratory analysis of <br />' the samples, <br /> • Calculating the groundwater flow direction and gradient based on water-level <br /> measurements from the wells, and <br /> • Summarizing the data and producing a quarterly report <br /> 1 <br /> 9 <br /> 1 <br />