Laserfiche WebLink
� i • <br /> i <br /> INFCrI%TJirNC <br /> 8.0 DOCUMENTATION <br />' 8.1 Site Safety Plan Agreement <br /> Versar personnel have the authority to stop work performed by our subcontractors at <br />' this site if any work is not performed in accordance with the requirements of flus Site Safety <br /> Plan <br /> All Versar, Inc project personnel and subcontractor personnel are required to sign the <br /> following agreement pma tQ conducting work at the site <br />' understand the Site Safety Plan and m individual <br /> A. I have read and fully unders ety y <br /> responsibilities <br /> B I agree to abide by the provisions of the Site Safety Plan <br /> Name Company Date Signature <br /> 1� <br /> 21 <br /> 1 <br />