My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
3500 - Local Oversight Program
>
PR0545701
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:27:02 AM
Creation date
5/28/2020 10:22:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545701
PE
3528
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g�,� �� t;r;.Ecrot <br /> �pF EnvironmentalHealth Depar �,l`i 119 C7ornn Herrn. R HS <br /> Z, 600 East main Street <br /> PROGRAh caoRntNA7 s <br /> Stockton, California ria 9w2f-302� A4araarer Lavoro REHS <br /> �w _ --- F.oberi F4cClel9on, RCHS <br /> Jeff Carruesce, REHS, R 1 <br /> Website: wivw.sjyov.org/efro Kasey Foley, REHS <br /> Phone: (209) 468-342.0 <br /> Fax: (209) 464-0938 <br /> October 23, 2009 <br /> Speelman Excavation <br /> 1648 Fairway Oaks Court <br /> Ripon, CA 95366 <br /> Attn: Harold Seelman <br /> Re: 239 Stockton Avenue,Ripon SR0058465 <br /> The permit application to remove a 12000 gallon three compartment, underground storage tank, <br /> associated piping, dispensers, turbine pumps, and appurtenances from the above referenced <br /> facility from the above referenced location has been approved with the following conditions: <br /> I. If the backfill material and soil is found to be contaminated it must be disposed of at an <br /> approved disposal location. Treatment of soil onsite can only be performed snider a <br /> hazardous waste treatment permit. <br /> 2. See pages 7 and 8 of the permit application for required number and locations of <br /> analytical tests. <br /> 3. EHD must witness the soil sampling. Schedule the soil sampling appointment with this <br /> office 48 hours in advance. <br /> 4. Schedule removal appointment 48 hours in advance. <br /> 5. All personnel involved in the removal of the existing pipes must fulfill requirements of <br /> CCR title 8 Section 5192. <br /> 6. A copy of the submitted"Health and Safety Plan"must be on the jobsite for review. <br /> 7. In addition, the following information must be submitted within 30 days of the removal <br /> date: <br /> (a) Analytical results, mailed from the lab <br /> (b) UST Tracking Record Sheet and Tank Hazardous Waste Manifest for each UST <br /> (c) Tank Closure Certification For n for each UST <br /> (d) Hazardous Waste Manifest for piping, rinsate, residual fuel, and if necessary <br /> backfill material. <br /> (e) Submit the backfill excavation certificate as required by San Joaquin County. <br /> If you have any questions please contact me at(209) 468-3439. <br /> Thank you, <br /> Muniappa Naidu, R.E.H.S. <br /> Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.