Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name <br /> Address r' U �u,F..; 1 j{ City Cz y~;'C� _ Zip i r' <br /> Phone No.(--") <br /> Hauler Registration#(if hauled as hazardous) <br /> e. Tank/Piping Disposal Site: <br /> Name <br /> Address_ r fc iP , •: City L; { c ._ _ —zip— <br /> Phone <br /> ZipPhone No.( - <br /> EPA IB#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES ] NO[] <br /> 9a. Describe,in detail,how the soil and/or water sampl s)beneath the tank and piping will be obtained:,, <br /> LjJitb <br /> S2 L1 b:2 <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> (J t t <br /> C_v'L�r <br /> t� <br /> 11. Handling of excavated soil_ <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? s X,r <br /> I 14t. <br /> c)Contaminated Soil Hazardous Waste Hauler: <br /> Name F Hauler Registration# <br /> Address City Zip _ <br /> Phone No.(_ ) <br /> EH 23 046 (Revised 07131/09) 5 <br />