Laserfiche WebLink
Work Plan For Soil Boring and Monitoring Well Installation,City of Ripon/Madsen Sunrise Dairy,Ripon,California <br /> December 2,2010 <br /> Task 5. Laboratory Analyses <br /> Soil and groundwater samples will be submitted'for chemical analyses to Kiff Analytical in <br /> Davis, California(NELAP#08263CA). Soil and groundwater samples will-be analyzed for Total <br /> Petroleum Hydrocarbons.as gasoline (TPHg) by Environmental Protection Agency (EPA) <br /> Method 8260, and Total Petroleum Hydrocarbons as'diesel(TPHd)and-motor oil (TPHd)by EPA <br /> Method 801.5 modified. The stockpiled soil sample will be analyzed for TPHg, TPHd, TPHmo- <br /> and benzene,toluene,ethylbenzene,:and:total xylenes (BTEX)by EPA Method 8260. <br /> Task 6. Reporting <br /> Following receipt and analysis of all data, a report will be prepared ,which summarizes the <br /> procedures and the results associated with this investigation. This report will be submitted to the <br /> City of Ripon for their use and distribution: ; <br /> PROJECT STAFF , <br /> Mr. Douglas J. Lee, a Professional Geologist in the, State of California (P.G. No:.6882) will provide <br /> technical oversight and review of the- work and will supervise implementation ;of field and office <br /> operations. GR employs a staff of geologists, engineers, and technicians who will assist with the project. <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory approval and well <br /> installation permits,and depending on drill rig availability. <br />