Geological Technics Inc Page 5 <br /> Ripon Milling Inc <br /> Report of Monitoring Well Installation <br /> • Project No 253 2 <br /> July 31, 1995 <br /> 2.10 Monitoring Well Development <br /> iWithin 48 hours of well installation after well sealing materials have had time to set, each monitoring <br /> well will be developed by mechanical surging and pumping until a clear stream is obtained All <br /> down hole equipment will be decontaminated before and between uses Development water will be <br /> removed from the well using either a bailer or a submersible pump and containerized in D O T <br /> approved drums (labeled contents under analysis) to await proper disposition After development <br /> the wells will be allowed to stabilize before they are purged and sampled <br /> I <br /> r <br /> lie <br /> i <br /> i <br /> i <br /> r <br />