My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
134
>
3500 - Local Oversight Program
>
PR0545703
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:45:44 AM
Creation date
5/28/2020 10:41:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545703
PE
3528
FACILITY_ID
FA0004977
FACILITY_NAME
MARKET ST PARKING STRUCTURE
STREET_NUMBER
134
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14913007
CURRENT_STATUS
02
SITE_LOCATION
134 S SUTTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.NIP r <br /> stole %mop <br /> JAMES GIOTTONINI <br /> PAGE 2 <br /> Smith Environmental will prepare the system design which will go out to <br /> bid within three weeks. The design, bidding, permitting and construction <br /> should be completed by December 1995. <br /> Argonne and Picardy <br /> Twinning grouted and sampled the recently installed monitoring well <br /> without notifying PHSIEHD. However, the soil and groundwater results <br /> showed nondetectable levels. The well must be sampled at least one <br /> more time (at least thirty days after the first sample event). If the <br /> second sample event yields nondetectable levels a closure report should <br /> be submitted to PHSIEHD and should include a workplan to destroy the <br /> monitoring well at the site. <br /> 1740 Houston Avenue <br /> Tank removal soil results confirm that the east end of the tank pit is <br /> clean at 11 feet. The grab sample from the middle of the excavation at <br /> 11 feet during the overexcavation activities on April 3, 1995 had a <br /> strong petroleum odor. A sidewall sample of unknown depth indicates <br /> that contamination is extending laterally beneath the building. <br /> An addendum to the existing workplan must be submitted to PHSIEHD <br /> within three to four weeks to describe the procedures to. <br /> 1) Backfill the east end of the tank pit in the presence of the <br /> PHSIEHD inspector. <br /> 2) Dewater and overexcavate the west end of the pit and the <br /> dispenser area. <br /> 3) Sample the west end sidewall to determine if an investigation <br /> beneath the building is warranted. <br /> 4) Submit a workplan for the investigation beneath the building if <br /> necessary. <br /> The workplan is to be implemented within two weeks of PHSIEHD <br /> approval. <br /> 2500 Navy Drive <br /> The angle borings under the maintenance building (131 and 132) showed <br /> residual contamination. All other soil boring and monitoring well sample <br /> results were non detect. Modeling of residual contamination will <br /> determine if further work or investigation/mitigation is required. <br /> 4010 East Main <br /> The soil borings recently installed at the site showed only a limited <br /> amount of soil contamination remaining between 10 and 15 feet. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.