Laserfiche WebLink
t <br /> File No. 20-1147-56. �„ KLEINFELDER <br /> August 25, 1994 <br /> The soil boring will be advanced using a hand auger and sampling system. The boring will <br /> be advanced, logged, and sampled following the protocol described in Attachment A. <br /> Task E03 - Reporting ` <br /> Upon completion of the field activities and receipt of the analytical results, a report of <br /> findings will be prepared for client and agency review. The report will include: <br /> • A description of the field activities, observations, and protocols <br /> • Tabulated results of soil samples with copies of certified results <br /> • Description and documentation of QA/QC procedures employed for field and <br /> laboratory work <br /> • Kleinfelder's conclusions and recommendations based on the data acquired <br /> ASSUMPTIONS AND CLIENT RESPONSIBILITIES <br /> • This proposal will be adequate to obtain authorization from the SJCEHD. If <br /> a more comprehensive workplan is necessary, additional charge for workplan <br /> preparation will be incurred. <br /> • The City of Stockton will have furniture moved and the carpet folded back <br /> exposing the concrete slab in the proposed location. <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to <br /> advance the soil boring at the proposed locations. A pachometer or similar <br /> rebar locating device will be used in placing the boring location on the <br /> concrete slab. If the'drilling equipment cannot be positioned, alternative <br /> drilling locations or sampling methods should be investigated at an additional <br /> cost. If concrete cutting is a problem because of reinforcing steel, a <br /> commercial concrete cutting company may be retained for this service. The <br /> boring is to be advanced with a hand auger and sampling system. If alternative <br /> drilling methods are required, additional costs may be incurred. <br /> • No respiratory protection or shoring will be necessary. <br /> • Soil generated during the drilling and sampling will be the responsibility of the <br /> client. Soil cuttings will be placed on. plastic and covered. Disposal or <br /> remediation options for the soil can be assessed once analytical results have <br /> been received. Kleinfelder can assist the client with the disposal of soil if <br /> necessary. <br /> ETH.md 14194 <br /> Copyright 1994 Kleinfelder, Inc. Page 4 of 6 <br />