My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
242
>
3500 - Local Oversight Program
>
PR0545704
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:58:04 AM
Creation date
5/28/2020 10:50:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545704
PE
3526
FACILITY_ID
FA0009999
FACILITY_NAME
AT&T California - UEX54/UE9AJ
STREET_NUMBER
242
Direction
N
STREET_NAME
SUTTER
STREET_TYPE
ST
City
Stockton
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
242 N SUTTER ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> f/ 8/22/13 <br /> SITE ADDRESS: �l ar.-�f. �i� �i� DATE: <br /> SITE NAME: LOP STAFF: 6A <br /> REQUEST FOR CLOSURE (AKA NFA) uploaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> receives ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain <br /> PG's concurrence. On PG saved LTCP check list as"FINAL","READY FOR CLOSURE" in GT. <br /> LOP staff provides list of sites for PG to advise CVRWQCB of NFA considerations for Unit meeting preparation. <br /> LOP Staff request RP's consultant for GT submittals of Tri-Regional Appendix A; Time tp reach WQG, initial & <br /> removed mass residuals, radius of influence from remediation pilot study. RB notified o ,,-submittals in GT. <br /> LOP staff, PG/ PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB at Unit Meeting/ <br /> phone/email. RB concurs informally on RB requires: to concur w/closure. <br /> /�/7�✓� Staff/consultant prepare Public Participation Notice (PPN). Staff approves final PPN for consultant's use. Mailing <br /> list of effecte properties and adlapent properties recipients (confidential) and P filed in LOP file. PPN uploaded <br /> to GT on/� /3 PPN sent toy/county�uilding Dept& l�� water purveyor. <br /> Comment period of 60 days beg ; completed-��, #of Comments recorded in narrative <br /> LOP Staff directs RP to complete CERTIFICATION OF RECORD FEE TITLE OWNERS FOR PENDING "NO FURTHER <br /> ACTION REQUIRED"(RTO) form, per Section 25297.15 (a), if one is not in the file. Narrative to indicate Staff verified a <br /> completed RTO is in the LOP file. The NFA closure letter may not be issued without completion of RTO. <br /> LOP Staff drafts Case Closure Summary (CCS) and CCS is reviewed by 'third party' staff member: `�h? `1 L15-Z4/13 <br /> U�OP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA and final version of CCS. <br /> lip I �ZJ LOP Staff submits 30-day CVRW CB letter dated w/ CCS and file to PC for review and signature. <br /> Response due in 30 days by: I I I I I I b Concurrence received on: Extension requested to: <br /> Non-concurrence letter from CVRWQCB Management received on: <br /> Staff uploads EHD letter to CVRWQCB without CCS & CVRWQCB concurrence letter w/check sheet on to GT. <br /> LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for MW destructions. Destruction permits issued <br /> (after 60 day PPN period) & Johnny notified of impending work. Destructions scheduled for <br /> LOP Staff verifies and documents in narrative the destruction of all MWs. GT"GW Monitoring Frequency" screen <br /> updated to indicate MWs are destroyed. The NFA may not be issued until MWs are destroyed. <br /> LOP Staff verifies and documents in narrative that all onsite waste material was removed and properly disposed, <br /> and EHD accounting staff verified that all SR& D site fees have been paid. The NFA may not be issued <br /> without this documentation. <br /> LOP Staff asks clerical to prepare NFA & CCS for Director's signature within 30 days of verifying destruction of <br /> all MWs and receiving documentation waste material was properly disposed. LOP Staff provides clerical the <br /> name and address of all RPs who are to receive an original NFA. <br /> PG/PC reviews NFA, CCS, and narratives for entries documenting all required steps are completed to approve <br /> issuance of NFA letter from the Director. File, NFA, & CCS returned to clerical for Director's signature. <br /> Signed CCS and NFA originals are mailed by clerical to RPs. Clerical distributes copies for LOP Staff to upload to <br /> GT, LOP File, & PC for their records. <br /> Clerical updates Envision records with PE 3528 and Manage Site Mitigation Case/ROP case status/ Closed. <br /> LOP staff pulls all site files for clerical staff to place in LOP Closed File cabinets, until scanned into Questy. <br /> LOP staff updates GT"Project Information" &"Status-Definition" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.