My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
242
>
3500 - Local Oversight Program
>
PR0545704
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:58:04 AM
Creation date
5/28/2020 10:50:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545704
PE
3526
FACILITY_ID
FA0009999
FACILITY_NAME
AT&T California - UEX54/UE9AJ
STREET_NUMBER
242
Direction
N
STREET_NAME
SUTTER
STREET_TYPE
ST
City
Stockton
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
242 N SUTTER ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHVEPARTMENT <br /> °P4u�N c� SAN JOAQUIN COUNTY <br /> Z-� Donna K. Heran, R.E.H.S. Program Coordinators <br /> " :.4 Director 304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> -_ Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> c4 •.:... `�P Margaret Lagorio, R.E.H.S. <br /> Assistant Director <br /> �rFpRN Telephone: (209)468-3420 <br /> Robert McClellon, R.E.H.S. <br /> Fax: (209) 464-0138 Jeff Carruesco, R.E.H.S. <br /> Website:www.sjgov.org/ehct/ Kasey Foley, R.E.H.S. <br /> AUG 31 2006 <br /> STEPHANIE FURGAL <br /> CHEVRON ENV MGMT COMPANY CHRISTINE CORONEO <br /> 6001 BOLLINGER CANYON RD SUTTER OFFICE CENTER <br /> ROOM K2240 2001 UNION STREET #300 <br /> SAN RAMON CA 94583 SAN FRANCISCO CA 94123 <br /> RE: Former Chevron Station 9-8227 Site Code: # 9327 <br /> Sutter Office Center <br /> 242 Sutter Street <br /> Stockton CA 95202 <br /> San Joaquin County Environmental Health Department (SJC/EHD) has reviewed <br /> Response to Comments — Work Plan Addendum dated August 24, 2006, submitted on <br /> your behalf by Blasland, Bouck & Lee, Inc. (BBL) and has the following comments. <br /> SJC/EHD had requested clarification of two issues presented in the July 26, 2006 Work <br /> Plan for Additional Site Assessment near MW-1. One issue was the need for a boring <br /> located northwest of MW-1; data exists in that area from Unocal monitoring well U-7. The <br /> U-7 boring log and a copy of the soil analytical data is attached; BBL can obtain additional <br /> information on this well when they complete their proposed file review. <br /> The second issue is the vertical definition of the soil contamination in the area of MW-1. <br /> Soil samples from CPT-1, located near MW-1, contained 4,800 milligrams per kilogram <br /> (mg/kg) total petroleum hydrocarbons (TPH) as gasoline at 78 feet below surface grade <br /> (bsg), but were non-detect at 55 feet bsg for both TPH as gasoline and diesel. BBL <br /> considers this to indicate that the contamination of the 500-gallon tanks thought to be <br /> closed in place near this location to be defined at 55 feet bsg. SJC/EHD considers it to <br /> be premature to call the soil contamination at this location defined when the actual <br /> location of the 500-gallon tanks has not been determined, and with no explanation for the <br /> contamination noted at the deeper sample. It is not unusual for contaminants to follow an <br /> irregular pathway while migrating downward. <br /> The following scope of work to obtain additional data necessary to prepare a feasibility <br /> study is approved for implementation: <br /> 1. One soil boring will be advanced at a location approximately 30 feet east of MW-1; <br /> this boring will be converted to shallow groundwater monitoring well MW-6 with a <br /> screen interval from 20-40 feet bsg. SJC/EHD recommends this boring be drilled <br /> to approximately 80 feet bsg to collect soil samples to verify the CPT soil sample <br /> results. If appropriate, an additional short screened monitoring well should be <br /> installed across the first sand unit underlying the proposed 20-40 foot screen <br /> interval, to monitor the sand which is a potential migration pathway at that depth. <br /> 2. All existing, and new, monitoring wells will be surveyed to an established <br /> benchmark for elevation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.