My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010509
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
242
>
3500 - Local Oversight Program
>
PR0545704
>
ARCHIVED REPORTS_XR0010509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 11:08:15 AM
Creation date
5/28/2020 10:55:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010509
RECORD_ID
PR0545704
PE
3526
FACILITY_ID
FA0009999
FACILITY_NAME
AT&T California - UEX54/UE9AJ
STREET_NUMBER
242
Direction
N
STREET_NAME
SUTTER
STREET_TYPE
ST
City
Stockton
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
242 N SUTTER ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ISite Background Information <br /> . SUTTER OFFICE CENTER <br /> 1 242 North Sutter Street, Stockton, California <br />' On 09 to 11 April 2003, five soil borings (CPT-1 to CPT5)were advanced on-and off--site utilizing <br /> cone penetrometer testing(CPT)technology At each boring location, lithologic data was collected <br /> from the Initial CPT boring, an adjacent twin boring was then advanced at each CPT location to <br />' collect grab ground water samples from selected depths The objective of the Investigation was to <br /> model the geologic and hydrogeologic frameworks and to assess potential dissolved <br /> petroleum-migration pathways beneath the site Soil borings for sounding were as follows <br />' 0 CPT-1 was established in the vicinity of monitoring well MW-1 and soil borings A and I to <br /> a depth of 150 feet bsg, <br /> • CPT-2 was established in the vicinity of soil borings B and J to a depth of 160 feet bsg, <br /> • CPT-3 was established west of boring C to a depth of 160 feet bsg, <br />' 0 CPT-4 was established south of monitoring well MW-1 and soil borings E and G to a depth <br /> of 150 feet bsg, and <br />' 0 CPT-5 was advanced at the northeast corner of the intersection of California Street and <br /> Miner Avenue to a total depth of 160 bsg <br /> Ground water and soil samples were collected from CPT boring locations at the following intervals <br /> • CPT-1 was sampled between 96 and 100 feet bsg, 120 and 124 feet bsg, and 146 feet and <br /> 150 feet bsg, <br /> • CPT-2 was sampled between 93 and 97 feet bsg, 120 and 124 feet bsg, 146 and 150 feet bsg, <br /> and 181 and 185 feet bsg, <br /> • CPT-3 was sampled between 56 and 60 feet bsg, 104 and 107 feet bsg, 120 and 124 feet bsg, <br /> and 143 and 147 feet bsg, <br /> • CPT-4 was sampled between 101 and 105 feet bsg, 120 and 124 feet bsg, and 141 and <br /> 145 feet bsg, and <br /> • CPT-5 was sampled between 56 and 60 feet bsg, 104 and 108 feet bsg, and 146 and 150 feet <br />' bsg <br /> Soil samples were collected from boring CPT-1 at 55 and 78 feet bsg <br /> The computer-generated CPT litholo is logs were integrated with previous sub <br /> surface loll <br /> descriptions to construct the subsurface geologic model The site stratigraphy is composed <br /> predominantly of fine-grained soil consisting of silt, clayey silt, silty clay, and clay, with the <br /> exception of five significant sand lenses, or layers The sand intervals are composed of sandy silt, <br /> Advanced GeoEnvironmentai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.