My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SWIFT
>
781
>
3500 - Local Oversight Program
>
PR0545705
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:22:06 PM
Creation date
5/28/2020 12:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545705
PE
3528
FACILITY_ID
FA0005062
FACILITY_NAME
GOLDEN EAGLE EXPRESS TRUCKING
STREET_NUMBER
781
STREET_NAME
SWIFT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16326003
CURRENT_STATUS
02
SITE_LOCATION
781 SWIFT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f I Ifif I- <br /> 13.17. REQ t DESTROYngr pvfOwmPjNGwEr AND EXPLORAnON HOLES <br /> l <br /> 13.17.1. A monitoring well small tieinvestigated to deter its condition and details or its <br /> construction prior to its destruction. <br /> 13.17.2. The well shall be sounded immediately before it is destroyed to determine whether <br /> there are obstructions that will interfere with filling and sealing. <br /> 13.17.3. Any obstructions found in the well or boring shall be removed before filling and <br /> sealing operations begin. _ <br /> 13.17.4. If the well was constructed and maintained in accordance with these Standards, the . <br /> sealing material shall be placed under pressure to ensure that the monitoring well is <br /> properly filled and sealed. �~ <br /> 13.17.5. Casing material may require perforation, or puncturing, to allow for proper <br /> placement of sealing materials. <br /> 13.17.5. If the well construction is unknown and/or is located in an area of known or <br /> suspected pollution or contamination, the well shall be destroyed by removing all <br /> _ ..material within.the original borehole including.the well casing, screen, fitter pack, <br /> and annular seal); and the created hole filled completely with appropriate sealing <br /> material. <br /> 13.17.7. Exploratory borings, installed for sampling purposes, shall be completely grouted <br /> with appropriate sealing material. The top 3 feet of the boring may be backfilled <br /> with clean. uncontaminated fill material- <br /> 13.17.8. <br /> aterial.13.17.S. The well or exploratory boring shall be filled by use of a tremie pipe or equivalent, <br /> proceeding upward from the bottom of the well or boring. Any deviation from this <br /> method must be approved by the Director. <br /> 13.17.9. Sealing materials shall be placed in one continuous operation unless conditions in the <br /> well or boring dictate that sealing operations be conducted in a staged manner and <br /> prior approval is obtained from the Director. <br /> 13.17.10. Pressure required for the placement of sealing material shall be maintained long <br /> enough for sealing materials to properly set. <br /> 13.17.11. Verification shall be made to determine that an adequate seal has been installed by <br /> a EHD representative. <br /> 13.17.12. If the well casing was left in place during sealing operations, a hole at least one foot <br /> larger m diameter than the originally drffled hole shall be excavated around the <br /> outside of the well ding to a 401h of 3 feet be ow surface and the well <br /> casing shall then be cat off 6 inches above the bottom of°this excavation and <br /> removed. <br /> 13.17.13. The grout used to fill the well shall be allowed to spill over,into the excavation, <br /> during the sealing operation, and fill it for a thickness of one foot and form a "cap" <br /> which has a diameter of at least one foot greater than the diameter of the originally <br /> drilled hole. _ <br /> 13.17.34. After the sealing operation and the sealing��material �, &A-A-%- <br /> �he excavation� . <br /> filled with clean soil. (O'Z . <br /> 13.17.15. Any deviation from this section must obtain prior approval from the Director. <br /> U <br />
The URL can be used to link to this page
Your browser does not support the video tag.