My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SWIFT
>
781
>
3500 - Local Oversight Program
>
PR0545705
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:22:06 PM
Creation date
5/28/2020 12:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545705
PE
3528
FACILITY_ID
FA0005062
FACILITY_NAME
GOLDEN EAGLE EXPRESS TRUCKING
STREET_NUMBER
781
STREET_NAME
SWIFT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16326003
CURRENT_STATUS
02
SITE_LOCATION
781 SWIFT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CHRONOLOGY PAGE 3 <br /> 781 SWIFT WAY, STOCKTON <br /> 11/29/95 MI approves 10119 request to spread ND soil in 18 drums on-site. <br /> 1996 <br /> 02/26/96 Review of 118196 groundwater sampling event reveals East <br /> gradient and DTW- MW-1 at 25.22' bgs.. DTW about 5' over all <br /> well screens except for MW-6. Only MW-1 reports any hit, TPH-D <br /> at 80 ug/l. No BTEX. MI discusses over screen DTW concerns <br /> and recommends pump test for draw down at purge and sample <br /> groundwater while within screened interval. <br /> 03/07/96 MI generates comment letter concerning gap in QMR's and offers <br /> options to sampling versus new monitoring wells for wells with <br /> DTW over screened interval. MI request MTBE analyses on all a <br /> wells. <br /> 04/16/96 MI on site for sampling and draw down test. Current DTW- MW-1 <br /> is at 22.28' bgs (over 13 feet over screened interval). Equipment <br /> problems and draw down not completed. <br /> 04/18/96 Draw down test conducted today. Unable to draw down MW-2 and <br /> 3 due to high recharge and low volume 2" pump. MW-1, 4, and 6 <br /> drawn into screened intervals. <br /> 07/26/96 MI discusses site extensively with Kurt in preparation for closure <br /> since all wells are and have been ND since first of 1996. <br /> 10/22196 3' QMR for 7126 event indicates NE gradient. All wells still ND. <br /> MTBE also ND. . <br /> 1997 <br /> 05/01/97 Kurt Balesek calls for status and response to his Closure Report. <br /> MI checks all file and binders and cannot find report. NO review or <br /> conclusions reached by EHD. Kurt to send another report. <br /> 05/06/97 "Project Summary and Request for Closure" received today. Ml <br /> notifies Kurt report is here and Ml to review as previously submitted <br /> reports and workpians are completed. <br /> 05/16/97 MI reviews closure report and requests tank tracking records not <br /> ever submitted form UGT removals. MI approves closure report <br /> contingent upon valid manifest submittal. <br /> 05/19/97 Case Closure Summary prepared as tracking records arrive and MI <br /> accepts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.