Laserfiche WebLink
%ow/ V <br /> CAMBRIA <br /> crushed ice at or below 4°C,and transported under chain-of-custody to the laboratory. Laboratory-supplied trip <br /> blanks accompany the samples and are analyzed to check for cross-contamination. An equipment blank may be <br /> analyzed if non-dedicated sampling equipment is used. <br /> Grouting <br /> If the borings are not completed as wells,the borings are filled to the ground surface with cement grout poured <br /> or pumped through a tremie pipe. <br /> MONITORING WELL INSTALLATION, DEVELOPMENT AND SAMPLING <br /> Well Construction and Surveying <br /> Ground water monitoring wells are installed to monitor ground water quality and determine the ground water <br /> elevation, flow direction and gradient. Well depths and screen lengths are based on ground water depth, <br /> occurrence of hydrocarbons or other compounds in the borehole, stratigraphy and State and local regulatory <br /> guidelines. Well screens typically extend 10 to 15 ft below and 5 ft above the static water level at the time of <br /> drilling. However,the well screen will generally not extend into or through a clay layer that is at least three ft <br /> thick. <br /> Well casing and screen are flush-threaded,Schedule 40 PVC. Screen slot size varies according to the sediments <br /> screened,but slots are generally 0.010 or 0.020 inches wide. A rinsed and graded sand occupies the annular space <br /> between the boring and the well screen to about one to two ft above the well screen. A two ft thick hydrated <br /> bentonite seal separates the sand from the overlying sanitary surface seal composed of Portland type I,II cement. <br /> Well-heads are secured by locking well-caps inside traffic-ratcd vaults finished flush with the ground surface. <br /> A stovepipe may be installed between the well-head and the vault cap for additional security. <br /> The well top-of-casing elevation is surveyed with respect to mean sea level and the well is surveyed for horizontal <br /> location with respect to an onsite or nearby offsite landmark. <br /> Well Development <br /> Wells are generally developed using a combination of ground water surging and extraction. Surging agitates the <br /> ground water and dislodges fine sediments from the sand pack. After about ten minutes of surging,ground water <br /> is extracted from the well using bailing,pumping and/or reverse air-lifting through an eductor pipe to remove the <br /> sediments from the well. Surging and extraction continue until at least ten well-casing volumes of ground water <br /> are extracted and the sediment volume in the ground water is negligible. This process usually occurs prior to <br /> installing the sanitary surface seal to ensure sand pack stabilization. If development occurs after surface seal <br /> installation,then development occurs 24 to 72 hours after seal installation to ensure that the Portland cement has <br /> set up correctly. <br /> All equipment is steam-cicaned prior to use and air used for air-lifting is filtered to prevent oil entrained in the <br /> compressed air from entering the well. Wells that are developed using air-lift evacuation are not sampled until <br /> at least 24 hours after they are developed. <br /> Page 2 of 3 <br />