My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
SITE HISTORY_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:14 PM
Creation date
5/28/2020 12:32:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTON <br /> GEOSCIENCE <br /> 7F1 <br /> THE RESULTS TEAM - a it <br /> rP <br /> October 4, 1991 T 0 5 ISS-1 <br /> Mr. Harlin Knoll ENV]RO'N J►_ENTAL HEALTH <br /> Environmental Health Division PERMIT/SERVICES <br /> San Joaquin County Public Health Services <br /> P.O. Box 2009 <br /> Stockton, California 95201 30-0140-1 <br /> Subject: Submittal of Application for Permit to <br /> Construct a Recovery Well at <br /> Former Mobil Oil Service Station <br /> 2375 Tracy Boulevard <br /> Tracy, California <br /> Dear Mr. Knoll: <br /> Per my telephone conversations with Ms, Diane Hinson of <br /> October 4, 1991, I am enclosing a site plan and an <br /> application for a permit to construct a recovery well on the <br /> above referenced site. Also enclosed is a check for the <br /> application fee of $89.00. <br /> In addition, we request your review and approval of the <br /> Remedial Work Plan (RWP) as soon as possible in order that we <br /> may proceed with the installation of the remediation system. <br /> The RWP, dated April 5, 1991, was previously submitted to you <br /> by Mr. Steve Pao of Mobil. An addendum to the RWP was <br /> submitted on September 6, 1991 in which the proposed ground <br /> water recovery/treatment system was modified. In addition, <br /> an application for a National Pollutant Discharge Elimination <br /> System (NPDES) was recently submitted to the Regional Water <br /> Quality Control Board, Central Valley Region. System <br /> start-up is currently scheduled for December 1991. <br /> We would appreciate your cooperation by granting us an <br /> approval of the application for a permit to construct the <br /> proposed recovery well and notifying us of your approval of <br /> the RWP. <br /> Thank you for your kind cooperation. <br /> i <br /> Respectfully, <br /> ALTON GEOSCIENCE <br /> Tridib K. Guha <br /> Project Manager <br /> . Enclosure i <br /> cc: Mr. Steve Pao, Mobil Oil Corp. , Burbank, California <br /> 1000 Burnett Avenue,Suite 140 <br /> Concord,CaMornia 94520 <br /> (415)682-1582•FAX(415)682-8921 M <br />
The URL can be used to link to this page
Your browser does not support the video tag.