My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:42:15 PM
Creation date
5/28/2020 12:33:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> FORMER MOBIL OIL CORP. SS#10NP4 <br /> 2375 TRACY BLVD., TRACY <br /> LOP CASE CODES: 1897-1 and 0001718 <br /> CVRWQCB CASE#s: 390017 and 39001718 <br /> APN: 23207003 <br /> 06/06/1986 The EHD filed an Unauthorized Release Report (URR) on this date for a <br /> UST system precision test failure which occurred on May 23, 1986. <br /> 06/10/1986 On this date, 4 USTs were removed from the site. <br /> 08/27/1986 The date of Subsurface.Investigation Report prepared by Kaprealian <br /> Engineering, Inc. (KEI) <br /> 04/15/1987 The date of Subsurface Investigation of Soil and Groundwater prepared by <br /> KEI. <br /> 01/20/1988 The date of Supplemental Assessment of Soil and Groundwater prepared by <br /> - KEI. <br /> IC <br /> 12/05/'998 On this date the Site was placed in the LOP and a NOR was sent to RP. <br /> 08/16/1990 The date of Interim Report on Subsurface Investigation and Remedial <br /> Planning Study prepared by Alton Geoscience, Inc. (Alton). <br /> 04/21/1992 The date of Subsurface Investigation, Remediation System Installation, and <br /> Quarterly Ground Water Monitoring and Sampling Report. <br /> 12/27/1994 The date of Baseline Assessment Report prepared by EMCON Consultants. <br /> 09/23/1998 Soil was excavated in piping and dispenser area and results can be found in <br /> Soil Sampling Report with this date prepared by Gettler-Ryan Inc. (GRI). <br /> 05/06/2005 EHD filed a second URR on this date for a possible second release of MTBE <br /> that occurred in 1996; MTBE concentrations in ground water increased <br /> significantly in 1996. <br /> 05/31/2011 EHD received No Further Action Request Report with this date prepared by <br /> Stantec Consultants. <br /> 07/13/2011 EHD and CVRWQCB staff met on this date to review the site for NFAR; <br /> I <br /> both agencies agreed with site closure. <br /> 08/19/2011 Case Closure Summary and Site Chronology updated. Letter to the <br /> CVRWQCB will be sent requesting Site closure concurrence. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.