Laserfiche WebLink
0� 1111 <br /> ALTON GPQSClr:t1CP,pir <br /> Well Uevelopmenl end <br /> Weler Sampling rleld Survey <br /> Project A 30-190 Site: <br /> BP-Tra bate <br /> Well: Mw-1 Sampling Team: <br /> Well Development Method: <br /> Sampling Method: <br /> Describe Equipment Before Sampling This Well: Tri 1e Rinse <br /> Well Development/Wets Sampling Dal® <br /> Total Well Water level <br /> Depth: , feet Time: 11:55 Before Pumping: , <br /> Water Casing Diameter <br /> Cc�1��i4II .h 9'9 rh yDIMme Factor Vollume <br /> 14.05 feet x 0.16 0.65 <br /> 2-.25 _3 6.7 <br /> Depth Purging From: -_-n5_, feet. Time Purging Begins: 12:00 pM <br /> Notes on Initial bischarge: Clear u <br /> Time. Volume P-j T AIOtP_S <br /> 12:05 .3 7n 2.20 <br /> 32-LM 4 6.3_S Lt. prns:, s, a� cadorless <br /> 12-M E-5B <br /> 5 _ - - <br /> 2.24 X1000 64.5 oma <br /> 6 -E-5B- 2.30 X1000 64.7 S <br /> 2.30 X1000 64.9 Sam <br /> -2--30-X1000 :6� Sam <br /> Time Field Parameter Measurement Begins: 1%ate, <br /> - pH A-�n <br /> Conductivity a 2a YiroO � 8-45 _8.45 <br /> Temperature (F) 64. 2.30 xtn00 2.30 X1000 ?_gin_ x,000 <br /> 54.7 -64-7 _sa <br /> Presample Collection Gallons Purged: 7 <br /> Time Sample Collection Begins: <br /> 12:25 ------ -Time Sample Collection Ends: <br /> 12:47 <br /> - Total Gallons Purged: <br /> _ Comments: <br />