Laserfiche WebLink
ALTON GEOSCIENCE,INC. <br /> Well bevelapmpnl and <br /> Mier SamplIng Field Survey <br /> Project 20-190 site: <br /> _.. - gP`-Pracy Date: X15/90 <br /> Well; MW-7 Sampling Team: W. Shipp, R. Eljurf <br /> Well Development Method: -------- <br /> Sampling <br /> ---__Sampling Method: Bailer <br /> Deacr-'Ue Equipment Before Sampling This Well: Triple Rinse <br /> ------------- <br /> Wit"O®vetoP01M/Welt Sampling Plata <br /> Total Well <br /> Depth: 15 feet Water level <br /> Time: Before Pumping: 5.80' <br /> Water Casing Diameter <br /> CDL= 2=inch A=iarhVolume <br /> 9.2 feet x <br /> .4 <br /> µ: Depth Purging From: feet. Time Purging Begins: <br /> Notes cry Initial Discharge: <br /> Zim PH <br /> NDtez <br /> 1:50 2.0 8.20 <br /> 1:52 �{Z00 -- 60-1_ No Odor <br /> 3.5_ 8.51 4x100Q _ fi7 d No Odor <br /> 1:55 3.0 7.51 1.14x1000 <br /> 7:57 5.5� 7.89 -�. No Odor <br /> 2:00 4.0 7.14x7000 62,E No Odor <br /> x7.84 1.79x1000 62^3 Na Odor <br /> Time Field Parameter Measurement Begins: <br /> h pH � <br /> Conductivity <br /> Temparature (F) <br /> x � — <br /> -----Pres <br /> ample_Cvllection--Gallons Purged: <br /> Time Sample Collection Begins: <br /> Time Sample Collection Ends: <br /> Total Gallows Purged: _ <br /> Comments: <br />