Laserfiche WebLink
4 <br /> ARCO f BP WELL MONITORING DATA SHEET <br /> S #: p w �t Station # 11�� <br /> Sampler: 1P. ri4i- Date -7 1 z 0-5- <br /> Well I D. ,�,,,,,t,,}-, Well Diameter: ( 3 4 b S <br /> Total Well Depth. t%_k.4n Depth to Water: G.s <br /> Depth to Free Product iThickness of Free Product (feet): <br /> Referenced to. VC Grade D.O. Meter (if re(fd): YSI HACH <br /> WelltameWell Plameuluher , 4.6(0 <br /> 1. 004 4" 065 <br /> 2" 016 6" 147 <br /> 3' 037 other radlusz"0163 ��� �•Va <br /> Purge Method Bader Sampling Method Bailer <br /> Disposable Bailer i Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> • 4,� X = L,17 Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (mS or 0) Gals Removed Observations <br /> IA-7 b3 a <br /> -- 1o5U `1. 1-(U - <br /> pT� Oo <br /> Did well dewater? Yes Gallons actually evacuated: 14S <br /> Sampling Time. -Vq, ktop Sampling Date: -71- os <br /> Sample 1 D. (.�mw _LL Laboratory: Paceequo Other <br /> Analyzed for MTBE D>ro xy 12 DCA EDB � Other <br /> mg/ <br /> O (if req'd)- Pre-purge mgl Post-purge L <br /> O�R�P (tf req'd) Pre-purge ni Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />