My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008050 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008050 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:51:03 PM
Creation date
5/28/2020 2:06:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008050 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIRS <br /> Mr Harlin Knoll Page 5 of 5 <br /> San Joaquin County Environmental Health Department <br /> July 12, 2005 <br /> Purge water generated during well development will be pumped into a Blaine Tech truck-mounted <br /> water tank The water will then be transported to the Blaine Tech holding facility in Sacramento, <br /> California Dillard Environmental Services will then dispose of the water at the Altamont Resource <br /> and Recovery Facility in Altamont, California <br /> The well locations will be surveyed with respect to northing and easting positions The top-of- <br /> casing elevations will be surveyed with respect to mean sea level (msl) <br /> Report Preparation <br /> Following receipt of analytical results, a report will be prepared summarizing the results of the <br /> investigation Soil boring logs,well construction details, and tabulated data will be included in the <br /> report <br /> Schedule <br /> Pending receipt of workplan approval from SJCEHD and access agreements from offsite property <br /> . owners, URS estimates that implementation will require approximately 12 to 16 weeks <br /> If you have any questions or comments regarding this letter, please call Mr Michael Hall at (916) <br /> 679-2261 <br /> Sincerely <br /> URS Corporation Americas �RED <br /> GE �0 <br /> PAUL ell <br /> No 7120 <br /> * <br /> Exp i 31 O <br /> Michael Hall Vernon Elarth, R LT `P <br /> Staff Geologist Project Manager OF CAOF <br /> Attachments Figure 1 — Site Plan with Proposed Boring Locations <br /> Attachment A — SJCEHD Correspondence <br /> cc Mr Kyle Christie, Atlantic Richfield Company <br /> K 1WprocessU5 BP ARCO\11194\2005 Well Install\11194 Well install WP 05 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.