Laserfiche WebLink
TIRS <br /> Mr Harlin Knoll Page 5 of 5 <br /> San Joaquin County Environmental Health Department <br /> July 12, 2005 <br /> Purge water generated during well development will be pumped into a Blaine Tech truck-mounted <br /> water tank The water will then be transported to the Blaine Tech holding facility in Sacramento, <br /> California Dillard Environmental Services will then dispose of the water at the Altamont Resource <br /> and Recovery Facility in Altamont, California <br /> The well locations will be surveyed with respect to northing and easting positions The top-of- <br /> casing elevations will be surveyed with respect to mean sea level (msl) <br /> Report Preparation <br /> Following receipt of analytical results, a report will be prepared summarizing the results of the <br /> investigation Soil boring logs,well construction details, and tabulated data will be included in the <br /> report <br /> Schedule <br /> Pending receipt of workplan approval from SJCEHD and access agreements from offsite property <br /> . owners, URS estimates that implementation will require approximately 12 to 16 weeks <br /> If you have any questions or comments regarding this letter, please call Mr Michael Hall at (916) <br /> 679-2261 <br /> Sincerely <br /> URS Corporation Americas �RED <br /> GE �0 <br /> PAUL ell <br /> No 7120 <br /> * <br /> Exp i 31 O <br /> Michael Hall Vernon Elarth, R LT `P <br /> Staff Geologist Project Manager OF CAOF <br /> Attachments Figure 1 — Site Plan with Proposed Boring Locations <br /> Attachment A — SJCEHD Correspondence <br /> cc Mr Kyle Christie, Atlantic Richfield Company <br /> K 1WprocessU5 BP ARCO\11194\2005 Well Install\11194 Well install WP 05 doe <br />