My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008052 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008052 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:52:46 PM
Creation date
5/28/2020 2:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008052 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date December 22,2004 <br /> 4 <br /> Quarter' 4's Quarter,2004 <br /> . ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11194 <br /> Address 2375 Tracy Blvd, Tracy, CA <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person URS/Jeff re Brooks <br /> Consultant Project No 38466552 OL058 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property owned by Conoco Phillips <br /> WORK PERFORMED THIS QUARTER (Fourth 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling according to modified schedule <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (First 2005): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Fourth 2004): <br /> • Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-4, MW-6, MW-7, AMW-3, AMW-5, and AMW-6 <br /> sampled Quarterly, MW-1, MW-2, MW-3, MW-5, MW-8, <br /> AMW-1,AMW-2, and AMW-4 Annually 3'd Quarter <br /> Frequency of Groundwater Monitoring All Wells Quarterly <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 4 48 to 7 49 feet below ground surface (bgs) <br /> Direction of Groundwater Flow Northwest - <br /> Groundwater Gradient 0 006 feet/foot ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following]mutations <br /> • The reported result for gasoline range organics(GRO) in sample MW-6 may be biased high as demonstrated by <br /> a high surrogate recovery due to matrix interference <br /> • The elevated reporting limits were the result of dilutions performed by the laboratory in order to quantitate a <br /> target analyte <br /> • <br /> K%WPTOCeSSV5BPARCO1111941QuanerlyV00414QTR 04\11194GWMR4QO4dm Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.