My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008099 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008099 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:58:09 PM
Creation date
5/28/2020 2:11:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008099 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date- January 21,2003 <br /> Quarter. 4'"Quarter, 2002 <br /> BP QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11194 <br /> Address 2375 Tracy Blvd, Tracy, CA <br /> BP Environmental Engineer Scott Hooton T <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466016 00336 <br /> Primary Agency/Regulatory ID No Harlin Knoll <br /> San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 2002): <br /> 1 Groundwater samples were collected from monitoring wells AMW-1 through AMW-6, and MW-1 through <br /> MW-8 and were subirutted for laboratory analyses <br /> 2 URS compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (First 2003): <br /> 1 Groundwater samples will be collected from monitoring wells AMW-1 through AMW-6, and MW-1 through <br /> MW-8 and subnutted for laboratory analyses <br /> 2 URS will compile and evaluate groundwater monitoring data <br /> QUARTERLY RESULTS SUMMARY (Fourth 2002): <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling AMW-1 through AMW-6, MW-1 through MW-8 Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sample Date 10/31/02 <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 4 4 to 7 0 feet below ground surface <br /> Direction of Groundwater Flow Northwest <br /> Groundwater Gradient 0 006 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following]nutations <br /> • Total petroleum hydrocarbons as gasoline (TPHg) results for samples MW-5 and MW-6 are confirmed as <br /> gasoline, <br /> • TPHg results for sample MW-7 are due to a discrete peak at C6 and C7, <br /> • Elevated reporting limits were due to dilutions performed by the laboratory in order to quantitate a target <br /> analyte, and <br /> K US BP ARC0\1I1941Qusver1y\4-QTR Ml 1194 QMR4QO2&c Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.