My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008110 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008110 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:47:27 PM
Creation date
5/28/2020 2:25:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008110 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLER - RYAN INC. - � <br /> January 3, 2001 <br /> l <br /> Mr David J Camille <br /> Tosco Marketing Company <br /> 2000 Crow Canyon Road, Suite 400 <br /> San Ramon,California 94583 <br /> Subject: Remedial Status Report for Tosco(Former BP)Station No. 11194 <br /> 2375 Tracy Boulevard,Tracy,California <br /> Mr Camille <br /> At the request of Tosco Marketing Company (Tosco), Gettler-Ryan Inc (GR)has prepared this report <br /> to document groundwater sampling, purging, and disposal for the subject site Activities documented <br /> in this report were initially proposed in GR's Work Plan for Groundwater Purging and Disposal <br /> (Work Plan), dated April 25, 2000 This work was performed to reduce methyl tertiary butyl ether <br /> (MTBE)concentrations in groundwater in the vicinity of the underground storage tank (UST) pit and <br /> groundwater monitoring well MW-2 Up to 5,000 gallons of groundwater have been purged from the <br /> UST pit backfill and disposed of weekly at the Tosco refinery in Rodeo,California <br /> Groundwater Removal and Disposal <br /> Groundwater was removed from the UST pit through the UST pit observation well OBS-W In <br /> conjunction with OBS-W, additional purging was carried out in AMW-5, and MW-2 between July 5, <br /> 2000 and August 14, 2000 accounting for about 10 % of the groundwater purged during this time <br /> period The groundwater was purged from these wells directly into vacuum trucks by Ox Industrial <br /> Services (Onyx) of Benicia,California and transported to the�°sco Refinery in Rodeo,Z ornia for <br /> disposal From May 3, 2000 to September 20, 2000, a.. j rnately_84,600-gallons of groundwater <br /> were removed from the site, primarily from OBS-W Groundwater removal totals and dates are <br /> summarized in Table 2 The locations of OBS-W,AMW-5 and MW-2 are shown on Figure i <br /> Groundwater Sampling <br /> Groundwater samples have been collected periodically from MW-2 and OBS-W and analyzed for <br /> Total Petroleum Hydrocarbons as Gasoline (TPHg) by EPA Method 8015, and benzene, toluene, <br /> ethylbenzene, xylenes (BTEX) and methyl tert-butyl ether (MtBE) by EPA Method 8020 The <br /> analytical results have been used to document hydrocarbon concentration trends and comply with <br /> Tosco Refinery requirements Sample dates and analytical results are summarized in Table 1 <br /> 6747 Sierra Court , Suite J • Dublin , California 94568 ( 925 ) 551 - -1555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.