Laserfiche WebLink
• � • R <br /> TABLE 1 SUMMARY OF RESULTS OF GROUNDWATER SAMPLING - <br /> BP OIL COMPANY SERVICE STATION NO 11194 <br /> 2375 TRACY BOULEVARD TRACY CALIFORNIA <br /> AUSTO PROJECT NO 10-085 <br /> WELL DATE OF CASING DEPTHTO PRODUCT GROUNDWATER TPH-G B T E X MTBE DO LAB <br /> ID SAMPLING ELEVATION {a) WATER THICKNESS ELEVATION (b) (4A) (Ug4) (LW) (too) ko) (ugA) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) (Feel) <br /> MINS 02/1590 2545 445 — 2100 1900 220 21 330 250 — - SUP <br /> MW-5 04/2690 2545 465 2080 - - - — - - <br /> MW-5 07/12/90 2545 472 — 2073 4400 140 94 130 300 — - SUP <br /> MW-5 0827190 2545 515 — 2030 - --- — — — - <br /> MW 5 11/02/90 2545 520 — 2025 - - — — — — --- <br /> MW 5 11!05/90 2545 521 — 2024 7500 430 55 760 1600 — -- SUP <br /> MW 5 02/25/91 2546 429 — 2116 2400 160 59 120 96 — — SUP <br /> MW-5 06127!91 2545 534 — 2011 ND<50 67 ND<05 ND<O5 ND<95 - CHR <br /> MVV 5 OSQ5191 2545 574 — 1971 1800 120 39 79 94 — SEO <br /> MW 5 1211091 2545 510 — 2035 720 46 34 38 513 — — SEG <br /> MW 5 03/25/92 2545 432 — 2113 550 75 033 40 3.2 — — SEO <br /> MW 5 06425/92 2545 — — — - - — - — —MWS (d) 12106"92 2545 1162 - 13 B3 - — — — - <br /> MW 5 03/10/93 2545 1211 — 1334 NDk50 NDN 5 NDA 5 NDN 5 ND<0 5 — — PACE <br /> MW 5 06/16/93 2545 1013 — 15 32 73 22 21 39 57 — --- PACE <br /> MW 5 14.22193 2545 499 - 2046 ND<50 NDN 5 NDN 5 NDN 5 NDN 5 - — PACE <br /> MW 5 01/24/94 2545 $91 --- 16 54 120 11 06 26 26 -- — PACE <br /> MW 5 06+07/94 2645 638 - 1907 ND<50 ND-05 NDN 5 ND<05 ND<0 5 — — PACE <br /> MW 0911394 2545 599 - 1946 ND40 ND<05 ND<05 ND<05 ND<05 — - PACE <br /> MW 5 01110+95 2545 435 - 2110 ND<50 ND<05 ND<05 ND<O 5 ND<t — — ATI <br /> MW-5 0312355 2545 419 - 2126 910 23 30 68 65 — 79 ATI <br /> OC-1 (c) 0312395 — — - 620 20 25 55 53 — — All <br /> MW-5 10/04195 2545 541 — 2004 ND<50 22 NDN 50 069 ND<i 0 78 69 ATI <br /> MW 5 01104/96 2545 462 - 2083 130 46 11 45 37 87 26 ATI <br /> MW 5 03129% 2545 445 - 2100 490 27 ND<1 20 12 13 27 SPL <br /> MW 5 07/01196 2545 501 - 20 44 580 35 5 30 13 11 37 SPL <br /> MN-0 02115/90 2563 425 - 2136 5700 220 21 330 250 - — SUP <br /> MW-6 0412690 2563 450 - 2113 — - — — — — — — <br /> MW-6 07/12/90 2563 468 - 2095 14000 590 16 1100 750 — — SUP <br /> MW{ 08/27/90 2563 - - - --- --- — — — — - <br /> MW-6 11/02/90 2563 --- --- - -- - — — — -- <br /> MW-6 11105/90 2563 502 — 2061 19000 390 17 1200 650 - SUP <br /> MW-6 02/25/91 2563 410 — 2153 66W 310 14 410 110 — - SUP <br /> MW-6 061/27/91 2563 509 - 2054 170000 260 61 140 370 — CHR <br /> MW-6 0912551 2563 560 — 2003 20000 510 19 910 340 - — SEQ <br /> MW-6 1211091 2563 488 — 2075 7500 170 69 350 60 — — SEO <br /> MW-6 03125192 2563 428 --- 2135 5100 920 30 990 360 — -- SEQ <br /> MW-6 06/25/92 2563 679 087 1949 - — — — — — — <br /> MW-6 12!0&192 2563 478 SHEEN 2085 - — - — - - - <br /> MW-6 03110/93 2563 423 SHEEN 2140 - — — — — — <br /> MW{ 06/16/93 2563 470 SHEEN 2085 - — — — — - — <br /> MW-6 1022/93 2563 494 SHEEN 2069 - --- - — — — — — <br /> MW-6 01124194 2.563 465 - 2098 4700 320 24 440 100 — PACE <br /> MW-6 (e) 46/47/94 2563 511 - 2052 - - — — — — — — <br /> MW-6 0911394 2563 571 — 1992 - — — — — <br /> MW-6 0111095 2563 322 — 2241 — — — — <br /> MW-6 03123/95 2563 386 — 2177 — <br /> MW-6 10101/95 2563 533 — 2030 - - - — — — <br /> hMl-8 01/04/96 2563 431 — 2132 - — — - — - <br /> MW-6 03+29/96 2563 417 — 2146 - - - — — — - <br /> MW-6 07/01196 2563 472 — 2091 - — - — — — — <br /> 30-Aug-96 PAGE 3 <br /> I <br />