My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008652 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008652 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:52:44 PM
Creation date
5/28/2020 2:35:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008652 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � _ <br />�l GROUNDWATER MONITORING AND SAMPLING REPORT <br /> BP Oil Company Service Station No 11194 <br /> 2375 Tracy Boulevard <br /> Tracy, California <br /> Project No 10-085-01-004 <br /> December 21, 1993 <br /> INTRODUCTION` <br /> This report presents the results and findings of the October 22, 1993 groundwater monitoring <br /> and sampling conducted by Alisto Engineering Group at BP Oil Company Service Station <br /> No 11194, 2375 Tracy Boulevard, Tracy, California A site vicinity map is shown in Figure 1 <br /> FIELD PROCEDURES <br /> Field activities were performed in accordance with the procedures and guidelines of the <br /> San Joaquin County Public Health Services and California Regional Water Quality Control <br /> Board, Central Valley Region <br /> Before purging and sampling, the groundwater level in each well was measured from a <br /> permanent mark on top of the casing to the nearest 0 01 foot using an electronic sounder The <br /> depth to groundwater and top of casing elevation data were used to calculate the <br /> groundwater elevation in each well in reference to mean sea level The survey data and <br /> groundwater elevation measurements collected to date are presented in Table 1 <br /> Before sample collection, each well was purged of 3 casing volumes, while recording field <br /> readings of pH, temperature, and electrical conductivity Groundwater samples were <br /> collected for laboratory analysis by lowering a bottom-fill, disposable bailer to just below the <br /> water level in the well' The samples were carefully transferred from the bailer into <br /> laboratory-supplied containers The water sampling field survey forms are presented in <br /> Appendix A <br /> - SAMPLING AND ANALYTICAL RESULTS <br /> The"results of monitoring and laboratory analysis of the groundwater samples for this and <br /> previous quarters are summarized m Table 1 The potentiometric groundwater elevations <br /> interpreted from the results of this monitoring event are shown in Figure 2 The results of <br /> groundwater analysis are shown in Figure 3 The laboratory report and chain of custody <br /> record are presented in Appendix B <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.