Laserfiche WebLink
� rRl <br /> BP WELL MONITOPJNG DATA SHEET <br /> Project # q a t- Station # lllgq <br /> a a F� <br /> Sampler VUl i IAC 5. Date q.-/3—q9 <br /> Well I D yv1W-,,Z_ Well Diameter 2 3 r4 6 8 <br /> Total Well Depth 13,95 JIM Depth to Water 5.61 <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Refei enced to vc 12Grade DO Meter (if req'd) YSl HACH <br /> Well Diameter Multiailer Well Diameter Multroher <br /> 2" 0 16 5" 102 <br /> 3" 037 6" 1 47 <br /> 4" 065 Other radms2*0 163 <br /> Put ge Method Bailer Sampling Method Bailer <br /> Disposable Bailer ><Qisposable Bailer <br /> Middleburg Extraction Port <br /> Xlectric Submersible Other <br /> Extraction Pump <br /> Other <br /> _Z X _ Gals <br /> 1 Case Volume (Gals ) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Gals Removed Observations <br /> V5 '7 7.6 6 S ISzCI -0 <3 <br /> 5 6 75 l8 <br /> 91-1 77. 6.3 P5 25 <br /> Did well dewater? Yes No Gallons actually evacuated ZS <br /> Sampling Time q Z Cr- Sampling Date y- ►3--9�91 <br /> Sample I D (Blind) ,� Laboratory SPL Other <br /> Analyzed for TPH- TE, �TBE TPH-D Other <br /> 10 DO (if req'd) Pre-purge mg/i, Post-purge <br /> OR P (if req'd) Pre-purge mV Post-purge mV <br />