Laserfiche WebLink
PA-2000083 (SA) (Early Consultation), S00013369 Page 3 of 3 <br /> 26603S. Hansen Rd, Tracy June 11, 2020 <br /> Joaquin County — Hazardous Materials Business Plan Program (HSC Sections <br /> 25508 & 25500 et sec.) <br /> d. Any amount of hazardous material stored in an Underground Storage Tank — <br /> Underground Storage Tank Program (HSC Sections 25286 & 25280 et sec.) <br /> L If an underground storage tank (UST) system will be installed, a permit is required <br /> to be submitted to, and approved by, the San Joaquin County Environmental Health <br /> Department (EHD) before any UST installation work can begin. <br /> ii. Additionally, an EHD UST permit to operate is required once the approved UST <br /> system is installed. <br /> e. Storage of at least 1,320 gallons of petroleum aboveground or any amount of petroleum <br /> stored below grade in a vault — Aboveground Petroleum Storage Program (HSC <br /> Sections 25270.6 & 25270 et sec.) <br /> L Spill Prevention, Countermeasures and Control (SPCC) Plan requirement <br /> f. Threshold quantities of regulated substances stored onsite - California Accidental <br /> Release Prevention (CaIARP) Program (Title 19, Section 2735.4 & HSC Section <br /> 25531 et sec.) <br /> L Risk Management Plan requirement for covered processes <br />