21 May 2007 <br /> AGE-NC Project No. 04-1045 <br /> Page 5 of 7 <br /> g Gr <br /> utilizing 2-inch diameter schedule 40 polyvinylchloride(PVC)0.020-inch slotted well screen from o+ <br /> 60 to 65 feet bsg and blank well casing.A 5-foot length of well screen is anticipated for installation Ga �S <br /> of the monitoring well. A proposed monitoring well construction diagram is depicted in Figure 3 <br /> The 8.25-inch diameter pilot borings will be single-completed as a ground water'monitoring wells <br /> utilizing 2-inch diameter schedule 40 polyvinylchloride(PVC)0.020-inch slotted well screen from <br /> 110 feet to 120 feet bsg; and blank well casing. A 10-foot length of well screen is anticipated for <br /> installation of the monitoring well. A proposed monitoring well construction diagram is depicted <br /> in Figure 4. <br /> After installing the well casing in each pilot boring, a filter pack material consisting of pre-washed <br /> #3 sand will be added through the augers over the screen interval to approximately two feet above <br /> the screened interval. Following placement of the filter pack, the well will be surged to assist in n <br /> settling the filter pack. Additional sand will be added if settling occurs. 4 <br /> A nominal two or three-foot bentonite seal will be placed above the filter pack to minimize the <br /> potential for grout penetration into the screened section of the well. The bentonite seal will be <br /> formed by pouring coated bentonite pellets into the annulus and allowing them to settle on the filter <br /> pack. The bentonite will be allowed to hydrate for a minimum of one-half hour prior to grouting. <br /> The remaining annular space will be filled within one foot of the ground surface with a cement grout. <br /> The grout mixture will consist of Type I/II portland neat cement and not more than 6 gallons of water <br /> per 94-pound sack of cement. The grout will be placed by pumping through tremmie pipe. A <br /> grouting inspection will be scheduled with EHD personnel. % <br /> Following completion of the monitoring wells,well elevations and locations will be surveyed by a <br /> California-licensed surveyor relative to a City of Stockton elevation benchmark. _.. <br /> 3.3. WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a stainless steel <br /> bailer to remove the major portion of fine-grained sediment from inside the well, surging to flush <br /> out or draw in sediment from the filter pack,and additional ground water evacuation(purging)with <br /> a Waterra bailing pump to finish the removal of fine-grained sediment. Developmental purging <br /> activities will be continued until field parameter (pH, electrical conductivity, and temperature) <br /> readings have stabilized and purged water is visually sediment-free. <br /> Advanced GeoEnvironmenhl,Inc. <br />