My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1601
>
2900 - Site Mitigation Program
>
PR0521845
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:11:30 PM
Creation date
5/28/2020 4:06:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521845
PE
2950
FACILITY_ID
FA0014838
FACILITY_NAME
LOPEZ PROPERTY
STREET_NUMBER
1601
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16504013
CURRENT_STATUS
01
SITE_LOCATION
1601 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k'g KLEINFELDER <br /> Provided the Consultant's report is still reliable (as determined by Consultant), Consultant may <br /> issue a third-party reliance letter to a party that Client identifies in writing under the following <br /> conditions: that the third party, including Client's successors and assigns, by such reliance, (1) <br /> agree in writing to be bound by Consultant's Terms and Conditions and (2) agree to pay <br /> Consultant's then-current fees for issuing such letters. <br /> The fees presented in this proposal/workplan are based on prompt payment for services <br /> presented in Kleinfelder's standard invoicing format. Additional charges will be applied for <br /> specialized invoicing and/or if backup documentation is needed. These special services will be <br /> charged on a time and expense basis. Late fees will be charged if payment is not received in <br /> accordance with terms contained in our contract. <br /> This proposal/workplan is based on Kleinfelder's standard terms and conditions which is <br /> attached. If changes are made to the terns and conditions, or if an additional insurance or <br /> liability coverage is desired, Kleinfelder reserves the right to modify its proposal/workplan/fee. <br /> Additionally, if an alternative contract is desired, some delays may be incurred as a consequence <br /> of our review. <br /> The safety of our employees is of paramount concern to Kleinfelder. You will be notified if the <br /> location of your project represents a potential safety concern to our employees. Unsafe <br /> conditions for field work will require a modification of our estimated scope of work and <br /> associated fees. We will advise you of the additional costs necessary to mitigate these <br /> unanticipated conditions, if applicable. <br /> This project has not been identified as being subject to prevailing wage laws. As such, our <br /> wages for field personnel are based on the competitive marketplace and may not be in <br /> compliance with the requirements for prevailing wage projects. In the event that prevailing <br /> wages are deemed by proper authority to apply to this project, additional, legally-mandated, <br /> labor-related charges will require a corresponding increase in our fee. <br /> 02001PROP.ENV/STO4P347/KS:ss Page 8 of 8 <br /> Copyright 2004,Kleinfelder,Inc. August 16,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.