My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:09 PM
Creation date
5/28/2020 4:38:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1%014 %,no, <br /> 2. At the start of the first rest period, the worker will determine their HR. <br /> This initial HR should not exceed the individual's age-adjusted <br /> maximum HR, which equals [(0.7)(220 - age in years)]. At 1 minute <br /> into the rest period, the recovery HR will be determined. The recovery <br /> HR should not exceed 110 beats per minute. <br /> 3. If the initial HR exceeds the age-adjusted maximum HR, or the 1- <br /> minute recovery HR is greater than 110 beats per minute, then the next <br /> work period will be decreased by 10 minutes. <br /> Heat stress due to water loss can be prevented. To prevent dehydration, water intake <br /> must approximate sweat loss. Water intake guidelines are as follows: <br /> 1. The sense of thirst is not an adequate regulator of water replacement <br /> needs during heat exposure. Therefore, water must be replaced at <br /> prescribed intervals: <br /> a. Before work begins, drink two 8-ounce glasses of water. <br /> b. During each rest period, drink at least two 8-ounce <br /> glasses of water. ' <br /> 2. Plain water, served cool, is excellent. An adequate supply of potable <br /> water and drinking cups will be readily available, such as in a support <br /> vehicle, to provide water during resting periods. <br /> 3. Adding salt to water is not recommended. However, other fluids, in <br /> addition to water, could include dilute fruit juices and electrolyte <br /> replacement drinks diluted 3:1 with water. Do not use salt tablets! <br /> An initial work/rest cycle of one hour work and fifteen minutes rest is recommended <br /> for protection of the staff when the heat stress hazard is high. The recommended <br /> cycle will be adjusted up or down based upon worker monitoring, environmental <br /> conditions, and the judgement of the site safety officer. At any time field team <br /> members recognize the signs or symptoms of heat stress prior to a scheduled rest <br /> period, they will notify the SSO immediately in order that a rest period can be called. <br /> Heat stress, if not prevented, results in heat stress illnesses. Two critical illnesses, if <br /> not recognized and treated immediately, can become life threatening. These are heat <br /> exhaustion and heat stroke. Heat exhaustion will result if the prevention measures 4 <br /> described above are not implemented. Ignoring the signs and symptoms of heat <br /> exhaustion will lead to the development of heat stroke. <br /> Heat stroke is an immediate, life-threatening condition that results because the body's <br /> heat regulating mechanisms shut down, and the body cannot cool itself sufficiently. <br /> As heat is excessively stored in the body, brain damage can result causing permanent <br /> disability or death. <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.