Laserfiche WebLink
SECTION 10 <br /> DECONTAMINATION <br /> Decontamination procedures associated with sampling activities are conducted by the <br /> Subcontractor. ICF personal are not expected to come in contact with potentially - <br /> contaminated materials due to the scope of worklintrusive. If Level C protection is <br /> warranted then, a will take place in the decontamination area identified on site. <br /> decontamination station will be set up on visquene and will include at least two 5 gallon <br /> buckets; one filled with a clean water and soap mixture and the other with clean water, paper <br /> towels, brushes and bags for disposal. All workers, PPE, sampling equipment, and heavy <br /> equipment leaving the work area will be decontaminated..to prevent the spread of hazardous <br /> materials. All workers will wash their hands, arms and face'and respirators after removing <br /> PPE and prior to leaving the site. Sampling equipment will not be reused:so <br /> decontamination is not necessary. Support vehicles are to be left outside the exclusion area <br /> so that decontamination will not be necessary. . Decontam` ination water will be contained <br /> labeled and properly disposed of in accordance with the requirements of the facility. <br /> k <br /> UNICE.SSITY /� <br /> 6.9.94/418a(YOOt-00 10-1 <br /> j <br />