My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2200 - Hazardous Waste Program
>
PR0538381
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 5:54:51 PM
Creation date
5/28/2020 5:53:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0538381
PE
2239
FACILITY_ID
FA0007096
FACILITY_NAME
PG&E: McDonald Island Compressor Station
STREET_NUMBER
1181
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
Rd
City
Stockton
Zip
95206
APN
129-310-12
CURRENT_STATUS
01
SITE_LOCATION
1181 N Zuckerman Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br /> Unstaffed Solar Electric Power Generation Sites <br /> PG&E owns and operates several Solar Electric Power Generation sites located within the PG&E service teritory. These systems <br /> convert solar energy into electricity by utilizing specialized photo voltaic panels to capture the energy from sunlight and perform the <br /> energy conversion. <br /> Most of these sites are located on land owned by PG&E. The sites range in size from 16 to 200 acres. Each Solar Electric Power <br /> Generation site is surrounded by a security fence with a locked gate to restrict access. <br /> AB1448_2020 Attachments.xls Page 7 of 8 Rev. 3/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.