Laserfiche WebLink
SA N.J OAQ U I N Environmental Health Department <br /> --COUNTY <br /> \q Greatness grows here. <br /> PERCOLATION TEST/SOIL PROFILE INSPECTION CHECKLIST <br /> SJC Ordinance Code,Title 9,Section 9-1105.2 <br /> EHD Policy for Percolation Test Procedure 98-01 <br /> Site Location: Date:T Ll 77-120 <br /> Test Performed b : Ye Permit#: s Od g 1q ygPA#: <br /> SITE MAP <br /> Includes perc test and soil profile locations with accurate measurements from a fixed reference point(must be able to locate <br /> the test hole areas in the future). Perc/soil profile holes must meet distance setbacks as noted in the sewage standards for <br /> septic system locations. Percolation test holes and soil profile pits must be conducted in the area proposed for future septic <br /> systems. <br /> Notes any changes in elevation on the subject pro ert . <br /> Notes all water wells. r— .S Fq n-7 we� <br /> Notes all man-made features(septic sstems, drives, barns, outbuildin s, animal pens,etc. . rj <br /> Notes all natural features (ephemeral drainage courses, large stands of trees, ponds, rivers, etc. <br /> P RC TEST PREPARATION PROTOCOL <br /> Date and time of test hole preparation. t4 20 2c7 _ M <br /> Diameter and depth of test hole ' 2"diameter and 36"-42"depth). 3, Ef <br /> Dimensions and depth of deep test hole 4"-12"diameter and 42"-25' or minimum 10'above seasonal high water table). <br /> Test hole preparation(scoring of sidewalls, removal of loose material). <br /> Bather conditions at time of testing (raining, windy, etc. u h n \ <br /> Soil type and condition encountered in test hole.N-ad <br /> clition of 2"of course sand or fine gravel to test hole. <br /> L11-Pre-soak by addition of minimum 12"of water over gravel 24-hours before test). <br /> PERC TEST CONDITIONS, MEASUREMENTS,AND REPORTING <br /> Condition of test hole after the 24-hour re-soak amount of water remaining in the hole, any soil sloughing noted). <br /> Correct amount of water used to refill hole 6"over gravel). Documented on the recordation sheet. <br /> escri tion of type of perc test procedure used based on conditions Procedure#1,#2, or 3 . <br /> Accurate recordings of drop and refill of water in same measurements. <br /> ame fixed reference point used for each reading. Description of reference point used to be included in the final report. <br /> Math calculations checked for accuracy. <br /> Beginning and end measurements of the last reading verified by REHS.All above reviewed and verified by REHS. <br /> SOIL PROFILE <br /> Description of the date,time, and protocol used to prepare soil profile pit. <br /> Description of soil profile pit including depth and dimensions. <br /> Soil lithology described b appropriate professional using indust standard protocol. <br /> COMMENTS + 26 , g7P71i ii <br /> �� <br /> -P�,�-c ra 15 <br /> -�s,� 4�_ VVp-5 1. S-�� j;--q,0,n S1Ae4 <br /> REHS Name: ' i 0— <br /> Calculations Examples: <br /> Last drop reading=.07'over 30 minutes time. Last drop reading=1.2'over 10 minutes time. <br /> .07'x 12"=.84"(convert from feet to inches) 1.2'x 12"=14.4"(convert from feet to inches) <br /> 30 minutes-.84"=35.7 minutes/inch 10 minutes_14.4"=.69 minutes/inch <br /> EHD 4200-xx 8-1-2018 <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />