Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? © ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, Q ❑ <br /> functional) tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with © El ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings ? [Z ❑ 11 <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? _ Z L1 ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? - � m Q ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑ ❑ <br /> Sump ❑ Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g . , modem) operational? 21 ❑ ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Replaced TLS Battery for PM Purpose, <br /> X. INJANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be com leted if in-tank gau inig s used to perform leak detection monitorin . <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ❑ ❑ ' <br /> tested, and confirmed o erational? <br /> Was accuracy of system's product level readings tested? z ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ <br /> Were all probes reinstalled properly? A Q ❑_ _ El <br /> Were all items on the equipment manufacturer's maintenance checklist completed? z y ❑ ❑v <br /> For any answer of "N" above, describe In Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br /> i <br />